DETERMINATION OF HEADWAY AND AVERAGE TRAVEL SPEED OF VEHICLES

USER'S INSTRUCTIONS: The project work you are about to view is on "determination of headway and average travel speed of vehicles". Please, sit back and study the below research material carefully. This project topic "determination of headway and average travel speed of vehicles" have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "determination of headway and average travel speed of vehicles" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "determination of headway and average travel speed of vehicles" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

DETERMINATION OF HEADWAY AND AVERAGE TRAVEL SPEED OF VEHICLES

BY

---
EE/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---

DECEMBER,2018



APPROVAL PAGE

This is to certify that the research work, "determination of headway and average travel speed of vehicles" by ---, Reg. No. EE/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.

By
---                                                     . ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work "determination of headway and average travel speed of vehicles" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "determination of headway and average travel speed of vehicles" visible for everyone, then the complete material on "determination of headway and average travel speed of vehicles" is to be ordered for. Happy viewing!!!


ABSTRACT

Since it is compulsory that people and goods move from one part of the country to the other or within particular defined regional area, the facilities used for this purpose need to be well planned, designed and constructed. Inadequate and unplanned traffic control constitute a lot of problems resulting in delay, congestion, immobility to uneasy access to transport etc. This project is to determine the headway and average travel speed of vehicles (Case study of post office- Kwara State Polytechnic permanent site car park road). In order to determine the time taken, distance, speed of a vehicle of the existing road network. Having considered the necessary observations from the post- office to Kwara state polytechnic permanent site car park we are able to observe that the distance is 10. 5km and the time taken varies where the lowest value of time taken from day one is sixteen (16) minutes while the highest is twenty two minutes (22) while on the second day we were able to determine the time taken from 8: 19am – 9: 30am and the total lowest value of the time taken is twenty (20) minutes while the highest is twenty two (22) minutes and the total average headway for the day one is 3.5 minutes while the total average headway for the day two practical is 4.5 minutes and the determination of the average speed of the day one practical is 11.2km per hour while the average speed for the second day practical is 11. 20km per hour and the total value for day 1 and 2 is 11. 15km per hour and also we are able to determine the day like Monday, Tuesday, Friday are the days that have much masses while Wednesday, Thursday are not much and also from the result, the Average Daily Time (ADT) of traffic volume shows that morning peak hour flow is 8: 00am to 9: 00am everyday, due to Kwara state polytechnic permanent site students and also the staff and University of Ilorin Teaching Hospital (UITH) that was moved to Oke- Oyi which was sited along the same direction, due to movement of student and workers that are going to their normal daily activities and also the afternoon peak hour is 4: 00pm to 5: 00pm when they are returning from their daily activities but the traffic flow is high in the morning than that of the afternoon peak hour flow. 

TABLE OF CONTENTS
Title page                                                                                                   i
Declaration                                                                                                           ii
Dedication                                                                                                  iii
Acknowledgement                                                                                      iv
Abstract                                                                                                      v
Table of content                                                                                          vi
List of Table                                                                                               vii

CHAPTER ONE
1.0     Introduction                                                                                                1
1.1     Statement of the Problem                                                                           2
1.2     Aim of the Project                                                                                      3
1.3     Objectives of the Project                                                                             3

    1.      Methodology                                                                                     3

1.4     Scope of the Project                                                                          4
1.5     Justification of the Project                                                                4

CHAPTER TWO
2.0     Literature Review                                                                              6
2.1     Introduction                                                                                                6
2.2     Delay Studies                                                                                    6
2.3     Spot Speed Studies                                                                           7
2.4     Traffic Volume Studies                                                                     7
2.5     Traffic Signs                                                                                     8
2.6     Traffic Signals                                                                                   14
2.7     Factor that Contribute to Journey time                                                      15

CHAPTER THREE
3.1    Methodology                                                                                               19
3.2     Headway                                                                                           19
3.3     Average Speed                                                                                  20
3.4     Explanation on Headway                                                                 22
3.5     Delay Studies                                                                                    23
3.6     Delay Studies                                                                                    24

CHAPTER FOUR
4.0     Data Analysis and Discussion of Result                                           34
4.1     Discussion on Traffic Volume                                                          34
4.2     Traffic Volume Study                                                                       35
4.3     Average Traffic Volume                                                                    36

CHAPTER FIVE         
CONCLUSION AND RECOMMENDATION
5.1     Conclusion                                                                                        38
5.2     Recommendation                                                                              39
REFERENCES                                                                                                          41

LIST OF TABLES
Table                            Title                                                                Page
3.1              The table below shows the Analysis of Different Travel
Time of Vehicles for the Determination of Their Headways.   21
3.2              Vehicle Composition for Both Direction on
Monday 1st May, 2017 at Post Office – Maraba Road.           26
3.3              Vehicle Composition for Both Direction on
Monday 2nd May, 2017 at Post Office – Maraba Road.          26
3.4              Vehicle composition for both Direction on Monday
3rd May, 2017 at post office – Maraba Road.                                   27
3.5:             Vehicle Composition for both direction on Monday
4th May, 2017 at post office – Maraba road.                                    27
3.6              Vehicle Composition for Both Direction on Monday
5th May, 2017 at Post Office – Maraba Road.                                   28
3.7              Vehicle composition for both directions on Monday
6th May, 2017 at Post Office – Maraba Road.                                  28
3.8              Vehicle composition for both Direction on Monday
7th May, 2017 at Post Office – Maraba Road.                        29

CHAPTER ONE
1.0     INTRODUCTION
The determination of headway and average travel speed on a road network cannot be over emphasized as concerns the transportation. Headway and average travel speed are among the imperative parameters to be mentioned in the consideration of traffic flow. The efficient evaluation of headway and average travel speed is important for their contribution to the effectiveness of road network functionality therefore adequate management practices are needed.
Headway is a measurement of the minimum possible distance or time between vehicles in a transit system. It is commonly measured as the distance from the tip of one vehicle to the tip of next one behind it, expressed as the time it will take for the tracing vehicle to cover that distance.
Headway is a key input in calculating most overall route capacity of any transit system e.g the route of Ilorin post office to the permanent site of Kwara state polytechnic Ilorin.
Headway spacing is selected by various safety criteria, but the basic concept remains the same – leave enough time for the vehicle to safety stop behind the vehicle in front of it.
The safety stop criteria has a non obvious solution, however, if a vehicle follow immediately behind the one in front, the vehicle in front simply cannot stop quickly enough to damage the vehicle behind.

1.1     STATEMENT OF THE PROBLEM
There are parameters that contributes traffic flows which headway and vehicle average travel speed are among - the determination and proper management of headway and average travel speed is hereby important as the improper management of road traffic flow cause lots of hindrance in transportation and also affects the populace in their day- in- day-out activities.
When the number of traffic is dense, there tends to be a traffic jam which can definitely maximize the time spent by the motorist or other road users to get to their various destination. As the number of vehicle tends to rise at a particular point on a road channel, it brings about the flow density being extremely large and this may affect the normal spacing (headway) in between the vehicles that are present on that road channel. The speed of vehicle is also affected by high volume of vehicles present at a point on a given road E.g. post office to Kwara State- Polytechnic permanent site as the driver can only make use of the space available for them.

1.2     AIM OF THE PROJECT
The aim of this project is to determine the headway and average travel speed of vehicle on the Post office-Kwara State Polytechnic permanent site car park  road.

1.3     OBJECTIVES OF THE PROJECT
The objective of the project include the following.

  1. To check on the maintenance of normal headway of vehicle trading from post office to the permanent site of kwara state polytechnic Car Park.
  2. To consider the usual time taken for a vehicle traversing the road due to indiscriminate parking along the road side.
  3. To check on the average travel speed of different vehicles on the road (Post-Office to Kwara State Polytechnic Car Park).
  4. To consider the journey speed of vehicle trading from post office to Kwara State Polytechnic Car Park Including all delays.
    1.   METHODOLOGY

The method of study can be defined as the techniques that will be used to carry out the research work on both roads. So, the various methods that will be employed to carry out this research include:

 

  1.  Reconnaissance survey.
  2. Field Study.
  3. Manual and mechanical Traffic Count.
  4. Analysis of Data.

1.4     SCOPE OF THE PROJECT
This project work is limited to the procedures involved in making standard policy and good comfort on our road network especially Post Office to Kwara State Polytechnic permanent site, Ilorin and putting in mind, the shortenings of improper implementation of road network policies. The project will be lucid enough to be as a guide that will allow our road maintenance agencies to know the effect of base functionality of our road network and to provide suitable correction for each problem stated.

1.5     JUSTIFICATION OF THE PROJECT
The failure of the existing strategies used in the provision of standard maintenance of road traffic flow as left many road users in transportation difficulties. For every road which is a busy type such as post office to Kwara State Polytechnic permanent site there should be an adequate maintenance of the traffic flow so as to reduce or curb away every set backs faced by the road users.
The outcomes and associated outputs of this project work would enable our government to provide adequate measure on the superior and maintenance of our road to avoid further occurrence of road problems.

Finally this study would stimulate research in new and other research areas that are hokey to provide useful data to in form policy making planning decision and advocacy efforts on our road.

1.6                                                         PROJECT ORGANISATION

The work is organized as follows: chapter one discuses the introductory part of the work,   chapter two presents the literature review of the study,  chapter three describes the methods applied,  chapter four discusses the results of the work, chapter five summarizes the research outcomes and the recommendations

CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of "determination of headway and average travel speed of vehicles" is also available. Order full work to download. Chapter two of "determination of headway and average travel speed of vehicles" consists of the literature review. In this chapter all the related work on "determination of headway and average travel speed of vehicles" was reviewed.

CHAPTER THREE: The complete chapter three of "determination of headway and average travel speed of vehicles" is available. Order full work to download. Chapter three of "determination of headway and average travel speed of vehicles" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of "determination of headway and average travel speed of vehicles" is available. Order full work to download. Chapter four of "determination of headway and average travel speed of vehicles" consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of design and construction of a "determination of headway and average travel speed of vehicles" is available. Order full work to download. Chapter five of "determination of headway and average travel speed of vehicles" consist of conclusion, recommendation and references.

 

CLICK HERE FOR MORE RELATED TOPICS/MATERIAL


To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions


For more information contact us through any of the following means:

Mobile No phonelogo:+2348146561114 or +2347015391124 [Mr. Innocent]

Email address emailus:engr4project@gmail.com

Watsapp No whatsapp.html :+2348146561114


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124

Watsapp Nowhatsapp.html
:+2348146561114


E
mail Address emailus:engr4project@gmail.com


FOLLOW / VISIT US VIA:

tweeter instagram.html pinterestusfacebook logo

Order Full Material(s)
Download Full Material(s)
Bank Accounts

Contact us

Hire a writer

Order/learn construction


View other related topics

Vrequently asked questions(FAQ)
View more related topics and download more material
Format = microsoft word

Chapters = 1-5 chapters


Price: N3,000.
»Accountancy (AC) project
» Agric engineering project topics
» Business admin and management project
» Banking and finance project
» Civil engineering project
» Co-operative economics and management project
» Computer science project
» Community Health Project
» Electrical/electronic/telecom/ power project
» Estate management project
» Education
» Human Kinetics & Health Education Project
» Industrial safety and environmental (ISET) project
» Mass communication project
» Mechanical engineering (ME) project
» Medical And Health Science Project
» Office technology and management (O.T.M) project
» Public administration (PA) project
» Public Health Education Project Topics
» Paramedic Project Topics
» Industrial Physics/Physics Electronics Project
» Science laboratory technology (microbiology option) project
» Agricultural science and engineering seminar
» Building engineering seminar topics/materials
» Civil engineering seminar topics
» Computer science seminar topics
» Environmental seminar topics
» Electrical/electronic/telecom/ power seminar
» Mechanical engineering seminar
» Physics / industrial physics/physics electronics seminar topics/materials