ABSTRACT

An Automatic Changeover Switch switches off the generator and automatically changes over to NEPA. An Automatic Changeover Switch will automatically switch off your generator and change over to MAIN ( Public power supply/NEPA) on resumption.
You will save fuel and no risk of electrocution. It also serves as power surge protector for appliances.
The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although, in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient, hence power instability and outage.
Power instability or outage in general does not promote development in the public and private sector. The investors do not feel secure to come into a country with constant or frequent power failure. These limit the development of industries. In addition, there are processes that cannot be interrupted because of their importance for instance, surgery operation in hospitals, transfer of money between banks and lots more.Power instability and outage in developing countries (Nigeria) creates a need for alternative sources of power to backup the mains supply.
Automatic changeover switches find a wide application scope wherever the reliability of electrical supply from the utilities is low and it is used in lighting/motor circuits wherever continuity of supply is necessary, for switching to an alternative source from main supply and vice versa.

CHAPTER ONE
1.1                             INTRODUCTION
The Change Over Switch I a device used to switch off a power supply and subsequently switch on another power supply. Basically it is aimed at switching on a more convenient power supply to the load.
Since it switches on power to the load, precautions has to be taken while choosing the type of Change Over Switch, while selecting the appropriate size, the control of arcing has to be put into consideration.
A good switch should be the one whose contact is made in such a way as to limit the arc formation by having no contact-bounce and by having contacts made of good conductive, corrosion resistance and wear resistance materials.
A good change over switch must have adequate insulation and  must be so constructed and located as not to constitute a potential hazard.
A good change over switch should also have tight contact points so as to limit or eliminate the possibility of partial contact at the contact point. The partial contact leads to over heating of the components and may lead to fire outbreak in the entire room.

1.2                       AIMS AND OBJECTIVES
Due to inconsistent supply of power, there is a growing need for an alternative source of power supply. This has lead to heavy capital investment in a bid to suppress power failure and ensure regular power supply for the industry, hospitals, schools and homes. The problem of power failure can be checkmated with the use of stand-by generating set.
An Engineering Author, “Tony Rudkin”  said in his book titled “Upgraded Signal Source with Improved Performance and Reliability” that the cost and depredation associated with breakdown vary from one application to the other, and in some cases, the user has little choice but to ensure that a stand-by unit is available to take over on event of failure of primary system.
If some of these big firm do not make provisions for stand-by power source, frustration could set in which may lead to the closure of business and thus throwing workers into unemployment. Also in the case of hospital, undergoing a surgical operation and power supply suddenly go off, the patient might loose his or her life due to the power outage.
Furthermore, if the president of the country is making nationwide broadcast and all of a sudden power went off in the transmitting station, it would be viewed as an attempt to sabotage the government ruling and some people must pay for it.
In his book, Tony Rudkin also said that the depredation caused by such reduce efficiency of the organization and leads to a great deal of frustration.
Sequel to the rate at which more sophisticated electrical/electronics gadgets are being procured and installed in our homes, hospitals and business premises, there is a justifiable need for a faster and more reliable change over system in an event of power outage.
In view of these considerations, this project is aimed at designing and constructing a workable automatic change over switch with a phase failure detecting circuit also known as “Automatic Mains Failure” which switches on the head from power Holding Company (PHC) to a generator when power fails and from generator to PHC when power comes back.

1.3                       SIGNIFICANCE OF THE PROJECT
The automatic change over switch, the switch aimed at achieving the following automatic actions;

The automatic change over unit can be operated in single or three phase system. The automatic change over switch has the following advantages;

Moreover, the size and captivity of the unit will depend upon the load for which it will be used. The unit is also portable, easy, convenient and safe to install.

 

1.4                       PURPOSE OF THE PROJECT
The purpose of this project is to maintain constant supply to the main circuit that is being supplied by making-up for the time lapse or delay that usually accompanies the manual switching from one source to another. The design comprises of the power connection circuit and control connection circuit. The main components to be used include; contactors, relays and timer.
1.5                        STATEMENT OF THE PROBLEMS
In every home, office or industries, automatic power changeover  plays a vital role, that is, It provides a means of switching from utility AC mains to generator in the case of power failure; This project has been improved on the existing types of electromechanical device that has being in use over the years.       
In the course of designing this project, different kinds of problem was notice such as:

1.6                     SCOPE AND LIMITATION OF THE STUDY
This work covers only a one phase automatic changeover which can only be used for providing a means of switching from one phase of AC mains to generator in the case of failure in public utility.

****************************************************************

This material is a complete and well researched project material strictly for academic purposes, which have been approved by different Lecturers from different higher institutions. We make abstract and chapter one visible for everyone.

All the Project Topics on this site have complete 5(five) Chapters . Each Project Material include: Abstract + Introduction + etc + Literature Review + etc + Conclusion + Recommendation + References/Bibliography.

To download the complete material click HERE

TO ALL OUR DISTINGUISED CUSTOMERS AND PARTNERS, WE ARE SAYING "THANK YOU" FOR CONSTANT AND REMARKABLE PATR-ONAGE. BUT TO OUR INTENDING CUSTOMER, WE ARE SAYING WELCOME TO OUR "PROJECT-MADE-EASY" HOME!

HOWEVER, IF YOU ARE SATISFIED WITH OUR SERVICES, PLEASE DO NOT FORGET TO INVITE YOUR FRIENDS AND COURSEMATES TO OUR HOME.