USER'S INSTRUCTIONS: The project work you are about to view is on "design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply" Please, sit back and study the below research material carefully. This project topic "design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply" have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

DESIGN AND CONSTRUCTION OF A MICROCONTROLLER BASED AUTOMATIC PHASE FAILURE CONTROLLER FOR 3-PHASE POWER SUPPLY

BY

---
EE/H2013/01430
DEPARTMENT OF ---
SCHOOL OF --
INSTITUTE OF ---

DECEMBER,2018



APPROVAL PAGE

This is to certify that the research work, "design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply" by ---, Reg. No. EE/H2007/01430 submitted in partial fulfillment of the requirement award of a B.Sc on --- has been approved.

By
Dr. ---                                                    Dr. ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
 Dr. ---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work “design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply” research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of “the rate and causes of infant mortality in edo state (case study of irrua specialist teaching hospital)” visible for everyone, then the complete material on “the rate and causes of infant mortality in edo state (case study of irrua specialist teaching hospital)” is to be ordered for. Happy viewing!!!


ABSTRACT

This project work is on the design and construction of automatic phase failure controller for 3-phase power supply. It provides a means of switching from one phase of AC mains to another in the case of failure in the existing phase using PIC16F88 as the heart of the project; This project has been improved on the existing types of electromechanical device that has being in use over the years.
Hence this has been achieved by the use of operational amplifier, timing circuit and high current relay switches and it is powered by 12V dc power supply.
The aim of this work is to design and construct an automatic phase failure controller introduces an automatic solution to overcome power fluctuation/phase interruption by selecting next most healthy available phase from three phase supply to feed the equipment without any notice of power outage.


TABLE OF CONTENTS

 TITLE PAGE

APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRACT
TABLE OF CONTENT

CHAPTER ONE

    • INTRODUCTION
    • AIM/OBJECTIVE OF THE PROJECT
    • SIGNIFICANCE OF THE PROJECT
    • STATEMENT OF PROBLEMS
    • LIMITATION OF THE PROJECT
    • PURPOSE OF THE PROJECT
    • APPLICATION OF THE PROJECT
    • METHODOLOGY
    • PROJECT ORGANISATION

CHAPTER TWO

2.0      LITERATURE REVIEW
2.1      REVIEW OF ELECTRICAL PHASES
2.2     REVIEW OF THREE-PHASE ELECTRIC POWER
2.3     REVIEW OF THREE PHASE GENERATION AND DISTRIBUTION
2.4    REVIEW OF THREE-PHASE LOADS
2.5     OVERVIEW OF RELEVANT TECHNOLOGY
2.6     REVIEW OF RELATED WORKS EXISTING SYSTEM
2.7     SUMMARY OF REVIEWED WORKS

CHAPTER THREE

3.0      METHODOLOGY
3.1      BLOCK DIAGRAM OF THE SYSTEM
3.2      DESCRIPTION OF THE SYSTEM  BLOCK
3.3      SYSTEM CIRCUIT DIAGRAM
3.4     CIRCUIT OPERATION
3.5     CALCULATION OF POWER SUPPLY
3.6      DESCRIPTION OF COMPONENTS USED


CHAPTER FOUR
RESULT ANALYSIS
4.0     CONSTRUCTION PROCEDURE AND TESTING
4.1     CASING AND PACKAGING
4.2     ASSEMBLING OF SECTIONS
4.3     TESTING OF SYSTEM OPERATION
4.4      COST ANALYSIS

CHAPTER FIVE     
5.0     CONCLUSION
5.1     RECOMMENDATION
5.2     REFERENCES 

CHAPTER ONE
1.0                                             INTRODUCTION
1.1                                       BACKGROUND OF THE STUDY
In Nigeria today the problems of power outage across phases is so rampant thus leading to some sensitive equipment and appliances being redundant, this could sometimes be the cause of one phase going out with respect to the other according to [William D, 2009] .
It may surprise one to note that in an attempt to solve this problems, so many unskilled electricity consumers has  in recent past resorted to some crude means of swapping between phases to obtain power. So many souls have been lost in this act. This is an undesirable condition to consumers and the need now arises to design a device that can automatically select among the phases and make power supply available at the consumers terminal [William D, 2009].
However, this can only be possible if one have a three phase met or and there is supply from any of the service line or the entire line, this project known as a three phase automatic phase selector has been constructed with a view of solving the problems stated above. The design and construction was based on the principle of Electro magneto-Dynamism and alignment as demonstrated in the contactor arrangement [Theo. Audel and Co, 1998].
Among other components are the timers miniature-circuit breakers the contactors and indicator bulbs, the ease with which the device is operated is well elaborated to ensure simplicity effort were made to present a stop by step operation of the project. As much as there is no project without limitation and applications, we have as well dedicated a section of this paper to look into it [William D, 2009].
In order to ease the effort of technicians in restoring the devices should there be any malfunction associated.
Faults and how they are cleared is presented, however, there are no user serviceable parts in the device therefore all maintenance should be referred to a qualified electrical personnel [Cotton H, 2011].

1.2                                   PROBLEM STATEMENT
Power failure in a country, state or city is highly detrimental to development in public and private industries. The insecurity associated with these problems brings about limitation to power consistent investments, thus hampering the development of industries and multinational ventures. Processes like carrying out surgical operations in hospitals, laboratories which require constant power supply for research, money transactions between banks and more require constant use of uninterrupted power. In other to solve this problem, an automatic changeover switch was invented. This research covers the design and construction of a single phase digital automatic power changeover. It has the capacity to automatically switch power from  national grid to generator and vice versa, once there is power failure in any of the two power supplies and at the same time has the capacity of shutting down a generator set once the mains grid is been restored according to Theo. Audel and Co, 1998.

1.3                                          OBJECTIVE OF THE PROJECT
The objective of this work is to design a device that will overcome power phase interruption by selecting next most healthy available phase to feed the equipment.

1.4                                      SIGNIFICANCE OF THE PROJECT
Industries require three phases power to run their machinery. Some of them require continuous \ uninterrupted power to maintain their data. Auto phase failure controller unit for equipment whose supply is single phase. The single phase supply is selected automatically from three phases supply.     
Auto Phase failure controller introduces an automatic solution to overcome power phase interruption by selecting next most healthy available phase to feed the equipment [ Fowler, Nick 2011].  

1.5                         LIMITATION OF THE PROJECT
In every home, office or industries, automatic phase selector plays a vital role, that is, It provides a means of switching from one phase of AC mains to another in the case of failure in the existing phase; This project has been improved on the existing types of electromechanical device that has being in use over the years.  
In the course of designing this project, different kinds of problem was notice such as:

  • Difficulty in troubleshooting with circuit without the circuit diagram
  • Difficulty in connecting the output without the three phases short-circuiting, until a multiplexing circuit was gotten.
  • Difficult in wiring because of the strong wiring the project required [ Fowler, Nick 2011].

1.6                               SCOPE OF THE PROJECT
This work covers only a three phase automatic phase failure controller which can only be used for providing a means of switching from one phase of AC mains to another in the case of failure in the existing phase.

1.7                           APPLICATION OF THE PROJECT
Here are some application where the controller is been used, like various large processing plants, pharmaceutical industry and also in thermal power station etc.
Here are also some example where huge application been controlled like infrastructure airport and railways. Automatic phase selector is also been used in commercial and service sector .This also reduces the manpower on field

1.8                                         METHODOLOGY
To achieve the aim and objectives of this work, the following are the steps involved:

  • Study of the previous work on the project so as to improve it efficiency.
  • Draw a block diagram.
  • Test for continuity of components and devices,
  • Design and calculation for the device was carried out.
  • Studying of various component used in circuit.
  • Construction of the device is carried out
  • Finally, the whole device was cased and final test was carried out.

1.8                                             DEFINITION OF TERMS
POWER OUTAGE / POWER FAILURE: A power outage is the loss of the electrical power network supply to an end user.
AUTOMATIC CHANGEOVER is device that automatically transfers power from generator supply to PHCN supply when available and stops the generator without without human intervention

1.8                             PROJECT ORGANISATION
The work is organized as follows: chapter one discuses the introductory part of the work, chapter two presents the literature review of the study,  chapter three describes the methods applied, chapter four discusses the results of the work, chapter five summarizes the research outcomes and the recommendations.

CHAPTER TWO: The complete chapter two of “design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply” is available. Order full work to download. Chapter two of “design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply” consists of the literature review. In this chapter all the related work on “design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply"

CHAPTER THREE: The complete chapter three of “design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply” is available. Order full work to download. Chapter three of “design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply” consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply” is available. Order full work to download. Chapter four of “design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply” consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of design and construction of a “design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply” is available. Order full work to download. Chapter five of “design and construction of a microcontroller based automatic phase failure controller for 3-phase power supply” consist of conclusion, recommendation and references.



To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions

You can also visit our facebook Page at fb.me/hyclas to view our related construction (or design) picture.


For more information contact us through Any of the following means:

Mobile No :+2348146561114 or +2347015391124 [Mr. Innocent]

Email address :engr4project@gmail.com

Watsapp No :+2348146561114

To View Our Design Pix: You can also visit our facebook Page at fb.me/hyclas for our design photos/pics.


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124
Watsapp No
:+2348146561114

E
mail Address :engr4project@gmail.com


CLICK HERE FOR MORE RELATED TOPICS/MATERIAL

IF YOU ARE SATISFIED WITH OUR SERVICES, PLEASE DO NOT FORGET TO INVITE YOUR FRIENDS AND COURSEMATES TO OUR PAGE.