DESIGN AND CONSTRUCTION OF A TIME BASED AUTOMATIC SWITCH FOR 3.8KW GENERATOR

USER'S INSTRUCTIONS: The project work you are about to view is on "design and construction of a time based automatic switch for 3.8kw generator" Please, sit back and study the below research material carefully. This project topic "design and construction of a time based automatic switch for 3.8kw generator" have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "design and construction of a time based automatic switch for 3.8kw generator" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "design and construction of a time based automatic switch for 3.8kw generator" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

DESIGN AND CONSTRUCTION OF A TIME BASED AUTOMATIC SWITCH FOR 3.8KW GENERATOR

BY

---
EE/H2013/01430
DEPARTMENT OF ---
INSTITUTE OF ---

DECEMBER,2018



APPROVAL PAGE

This is to certify that the research work, "design and construction of a time based automatic switch for 3.8kw generator" by ---, Reg. No. EE/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on Electrical and Electronics Engineering has been approved.

By
Dr. ---                                           Dr. ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
Dr. ---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work “design and construction of a time based automatic switch for 3.8kw generator” research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of “design and construction of a time based automatic switch for 3.8kw generator” visible for everyone, then the complete material on “design and construction of a time based automatic switch for 3.8kw generator” is to be ordered for. Happy viewing!!!


ABSTRACT

 

A time based automatic switch is an automatic timer switch that turns an appliance for the desired time duration. After the preset time duration, the timer automatically switches off, disconnecting the appliance from the power supply. The aim of this work is to build a time based automatic switch for a 3.8kva generator. The time duration for which the generator should be ‘on’ can be set from 1 to 99 minutes [1].

TABLE OF CONTENTS
COVER PAGE
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT

ABSTRACT
CHAPTER ONE

    1. INTRODUCTION
    2. BACKGROUND OF THE PROJECT
    3. PROBLEM STATEMENT
    4. AIM/OBJECTIVE OF THE PROJECT
    5. PURPOSE OF THE PROJECT
    6. SIGNIFICANCE OF THE PROJECT
    7. APPLICATION OF THE PROJECT
    8. LIMITATION OF THE PROJECT
    9. PROJECT ORGANISATION

CHAPTER TWO
LITERATURE REVIEW

    1. REVIEW OF TIMING DEVICES
    2. DESCRIPTION OF TIME MANAGEMENT
    3. REVIEW OF AC TIMERS
    4. REVIEW OF SWITCH

CHAPTER THREE
3.0     CONSTRUCTION METHODOLOGY
3.1      SYSTEM BLOCK DIAGRAM
3.2      SYSTEM CIRCUIT DIAGRAM
3.3      PARTS LIST
3.4      CIRCUIT DESCRIPTION
3.5      CIRCUIT OPERATION
3.6      PCB DESIGN AND COMPONENT LAYOUT
CHAPTER FOUR
TEST AND RESULT ANALYSIS

    1. CONSTRUCTION PROCEDURE
    2. CASING AND PACKAGING
    3. ASSEMBLING OF SECTIONS
    4. PACKAGING
    5. MOUNTING PROCEDURE
    6. TESTING
    7. RESULT ANALYSIS
    8. ASSEMBLE THE CIRCUIT ON A PCB

CHAPTER FIVE

    1. CONCLUSION
    2. RECOMMENDATION
    3. REFERENCES

 

 

 

CHAPTER ONE
1.0                                                        INTRODUCTION
1.1                                           BACKGROUND OF THE STUDY
The switch may be connected to an electric circuit operating from mains power, including via a relay or contactor; or low voltage, including battery-operated equipment in vehicles. It may be built into power circuits (as with a central heating or water heater timer), plugged into a wall outlet with equipment plugged into the timer instead of directly into the power point; or built into equipment as, for example, a sleep timer that turns off a television receiver after a set period [1].
The mechanism may be mechanical (e.g., clockwork; rarely used nowadays), electromechanical (e.g., a slowly rotating geared motor that mechanically operates switches) or electronic, with semiconductor timing circuitry and switching devices and no moving parts.
The timer may switch equipment on, off, or both, at a preset time or times, after a preset interval, or. This time based automatic switch switches generator, usually off, after a preset time [1][2].

1.2                                                  PROBLEM STATEMENT
Traditionally, a generator ON and OFF is done by manually pressing the generator switch. Sometimes, with this manual operation the user of the generator might forget to switch off the generator at his desired time. If it is at the night hour, the user might sleep off leaving the generator ON throughout the night. This leads to wasting of electric energy and fuel. However, this device was invented to solve this problem. This automatic switch increases the life of the appliance and also saves power consumption [1][2].

1.3                                                   AIM OF THE PROJECT
The aim of this work is to build an automatic switch that turns a generator ‘ON’ for the desired time duration. After the preset time duration, the timer automatically switches off the generator. The time duration for which the appliance should be ‘on’ can be set from 1 to 99 minutes [1][2].

1.4                                              PURPOSE OF THE PROJECT
The purpose of this work is to have an automatic means of ON and OFF of a generator set with having a direct contact with the switch.

1.5                                         SIGNIFICANCE OF THE PROJECT
This switch obviates the need to continuously monitor the appliance—an advantage over the manual switch. It can be used to switch on or switch off any electrical home appliance at a predetermined time. Switching an appliance on or off in a timely manner increases the life of the appliance and also saves power consumption [1][2].

1.6                                          APPLICATION OF THE PROJECT
This device is mainly made for a generator set and it can also be used to control the ON and OFF of other home appliances. The switch also finds industrial applications, where the machines which control the processes can be run for the desired time [1][2].

1.7                                           LIMITATION OF THE PROJECT
i. This device can only be used to control one generator.
ii. It can control generator from 750w to 3.8kw. When used with generator with additional power, a contactor can be used in place of a relay.

1.8                                                         PROJECT ORGANISATION
The work is organized as follows: chapter one discuses the introductory part of the work,   chapter two presents the literature review of the study,  chapter three describes the methods applied,  chapter four discusses the results of the work, chapter five summarizes the research outcomes and the recommendations.

CHAPTER ONE: The complete chapter one of “design and construction of a time based automatic switch for 3.8kw generator” is available. Order full work to download. Chapter one of “design and construction of a time based automatic switch for 3.8kw generator”consists of the literature review. In this chapter all the related work on“design and construction of a time based automatic switch for 3.8kw generator” was reviewed.

CHAPTER TWO: The complete chapter two of “design and construction of a time based automatic switch for 3.8kw generator” is available. Order full work to download. Chapter two of “design and construction of a time based automatic switch for 3.8kw generator” consists of the literature review. In this chapter all the related work on “design and construction of a time based automatic switch for 3.8kw generator” was reviewed.

CHAPTER THREE: The complete chapter three of “design and construction of a time based automatic switch for 3.8kw generator” is available. Order full work to download. Chapter three of “design and construction of a time based automatic switch for 3.8kw generator” consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of “design and construction of a time based automatic switch for 3.8kw generator” is available. Order full work to download. Chapter four of “design and construction of a time based automatic switch for 3.8kw generator” consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of “design and construction of a time based automatic switch for 3.8kw generator” is available. Order full work to download. Chapter five of “design and construction of a time based automatic switch for 3.8kw generator” consist of conclusion, recommendation and references.



To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions

You can also visit our facebook Page at fb.me/hyclas to view our related construction (or design) picture.


For more information contact us through Any of the following means:

Mobile No :+2348146561114 or +2347015391124 [Mr. Innocent]

Email address :engr4project@gmail.com

Watsapp No :+2348146561114

To View Our Design Pix: You can also visit our facebook Page at fb.me/hyclas for our design photos/pics.


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124
Watsapp No
:+2348146561114

E
mail Address :engr4project@gmail.com


CLICK HERE FOR MORE RELATED TOPICS/MATERIAL

IF YOU ARE SATISFIED WITH OUR SERVICES, PLEASE DO NOT FORGET TO INVITE YOUR FRIENDS AND COURSEMATES TO OUR PAGE.