USER'S INSTRUCTIONS: The project work you are about to view is on "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection". Please, sit back and study the below research material carefully. This project topic (design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection) have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.
TITLE PAGE
DESIGN AND CONSTRUCTION OF AN AUTOMATIC 3 PHASE SUPPLY MONITORING SYSTEM WITH HIGH AND LOW VOLTAGE PROTECTION
BY
---
EE/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---
DECEMBER,2018
APPROVAL PAGE
This is to certify that the research work, "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" by ---, Reg. No. EE/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.
By
--- . ---
Supervisor Head of Department.
Signature………………. Signature……………….
……………………………….
---
External Invigilator
DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.
ACKNOWLEDGEMENT
The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.
PROJECT DESCRIPTION: This work "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" visible for everyone, then the complete material on "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" is to be ordered for. Happy viewing!!!
This project work is on the “automatic 3 phase supply monitoring system with high and low voltage protection”. It provides a means of monitoring and switching from one phase of AC mains to another in the case of failure, high and low in the existing phase; This project has been improved on the existing types of electromechanical device that has being in use over the years.
Hence this has been achieved by the use of operational amplifier, timing circuit and high current relay switches and it is powered by 12V dc power supply.
The aim of this work is to design and construct an Auto Phase monitor and Selector introduces an automatic solution to overcome power fluctuation/phase interruption by monitoring and selecting next most healthy available phase from three phase supply to feed the equipment without any notice of power outage.
TABLE OF CONTENTS
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRACT
TABLE OF CONTENT
CHAPTER ONE
- INTRODUCTION
- AIM/OBJECTIVE OF THE PROJECT
- SIGNIFICANCE OF THE PROJECT
- PROBLEM STATEMENT
- LIMITATION OF THE PROJECT
- PURPOSE OF THE PROJECT
- APPLICATION OF THE PROJECT
- PROJECT ORGANISATION
CHAPTER TWO
2.0 LITERATURE REVIEW
2.1 REVIEW OF ELECTRICAL PHASES
2.2 REVIEW OF THREE-PHASE ELECTRIC POWER
2.3 REVIEW OF THREE PHASE GENERATION AND DISTRIBUTION
2.4 REVIEW OF THREE-PHASE LOADS
CHAPTER THREE
3.0 METHODOLOGY
3.1 BLOCK DIAGRAM OF THE SYSTEM
3.2 DESCRIPTION OF SOLAR INVERTER UNITS
3.3 SYSTEM CIRCUIT DIAGRAM
3.4 CIRCUIT OPERATION
3.5 THREE PHASE INPUT TO SINGLE PHASE OUTPUT
3.6 DESCRIPTION OF COMPONENTS USED
CHAPTER FOUR
RESULT ANALYSIS
4.0 CONSTRUCTION PROCEDURE AND TESTING
4.1 CASING AND PACKAGING
4.2 ASSEMBLING OF SECTIONS
4.3 TESTING OF SYSTEM OPERATION
4.4 COST ANALYSIS
CHAPTER FIVE
5.0 CONCLUSION
5.1 RECOMMENDATION
5.2 REFERENCES
CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND OF THE STUDY
In Nigeria today the problems of power outage, under or over voltage across phases is so rampant thus leading to some sensitive equipment and appliances being redundant, this could sometimes be the cause of one phase going out with respect to the other according to [William D, 2009] .
It may surprise one to note that in an attempt to solve this problems, so many unskilled electricity consumers has in recent past resorted to some crude means of swapping between phases to obtain power. So many souls have been lost in this act. This is an undesirable condition to consumers and the need now arises to design a device that can automatically monitors and selects among the phases and make power supply available at the consumers’ terminal [William D, 2009].
However, this can only be possible if one have a three phase met or and there is supply from any of the service line or the entire line, this project known as a automatic three phase monitoring has been constructed with a view of solving the problems stated above. The design and construction was based on the principle of Electro magneto-Dynamism and alignment as demonstrated in the relay arrangement [Theo. Audel and Co, 1998].
In this work, Faults and how they are cleared is presented, however, there are no user serviceable parts in the device therefore all maintenance should be referred to a qualified electrical personnel [Cotton H, 2011].
1.2 PROBLEM STATEMENT
Power failure / under and over voltage in a country, state or city is highly detrimental to development in public and private industries. The insecurity associated with these problems brings about limitation to power consistent investments, thus hampering the development of industries and multinational ventures. Processes like carrying out surgical operations in hospitals, laboratories which require constant power supply for research, money transactions between banks and more require constant use of uninterrupted power. In other to solve these problems, an automatic three phase changeover switch was invented. This research covers the design and construction of an automatic 3-phase monitoring system with high and low voltage protection. It has the capacity to automatically monitor the three phases and switch one healthy phase from the three.
1.3 OBJECTIVE OF THE PROJECT
The objective of this work is to design a device that will overcome under or overvoltage in the three phase thereby leaving our appliances in a save condition.
1.4 SIGNIFICANCE OF THE PROJECT
Industries require three phases power to run their machinery. Some of them require continuous \ uninterrupted\ safe power to maintain their data. The device monitors the three phase and select one healthy phase automatically from three phases supply[ Fowler, Nick 2011].
1.5 LIMITATION OF THE PROJECT
In every home, office or industries, this device provides a means of switching from one phase of AC mains to another in the case of failure/low or over voltage in the existing phase; This project has been improved on the existing types of electromechanical device that has being in use over the years.
In the course of designing this project, different kinds of problem was notice such as:
- Difficulty in troubleshooting with circuit without the circuit diagram
- Difficulty in connecting the output without the three phases short-circuiting, until a multiplexing circuit was gotten.
- Difficult in wiring because of the strong wiring the project required [ Fowler, Nick 2011].
1.6 SCOPE OF THE PROJECT
This work covers only an automatic three phase monitoring system with over and under voltage protection which can only be used for providing a means of monitoring the status of the three phase supply and thereby switching from one phase of AC mains to another in the case of failure, under or over voltages in the existing phase.
1.7 APPLICATION OF THE PROJECT
This device is used in the following places [Theo. Audel and Co, 1998]
- home,
- office,
- worship places
- workshops or industries
1.8 METHODOLOGY
To achieve the aim and objectives of this work, the following are the steps involved:
- Study of the previous work on the project so as to improve it efficiency.
- Draw a block diagram.
- Test for continuity of components and devices,
- Design and calculation for the device was carried out.
- Studying of various component used in circuit.
- Construction of the device is carried out
- Finally, the whole device was cased and final test was carried out.
1.8 DEFINITION OF TERMS
POWER OUTAGE / POWER FAILURE: A power outage is the loss of the electrical power network supply to an end user.
LOW VOLTAGE: voltage less than the required voltage supply for consumers appliances ( in Nigeria, voltage supply for consumers is 220VAC. That means when the supply voltage is less than 220 VAC it is said to have low or under-voltage).
HIGH VOLTAGE: voltage higher than the required voltage supply for consumers appliances (in Nigeria, safe voltage supply for consumers is 220 - 240VAC. That means when the supply voltage is higher than 240 VAC it is said to have high or over voltage).
1.8 PROJECT ORGANISATION
The work is organized as follows: chapter one discuses the introductory part of the work, chapter two presents the literature review of the study, chapter three describes the methods applied, chapter four discusses the results of the work, chapter five summarizes the research outcomes and the recommendations.
CHAPTER TWO
2.0 LITERATURE REVIEW
2.1 REVIEW OF ELECTRICAL PHASES
There is a major characteristic of an AC electricity supply that requires explanation -phases. A DC circuit has two wires through which the current in the circuit flows from a source of electricity through a load and back to the source [Brittain J. E, 2007]. A single-phase AC circuit also has two wires connected to the source of electricity. However, unlike the DC circuit in which the direction of the electric current does not change, the direction of the current changes many times per second in the AC circuit. The 220 volt electricity supplied to our homes is single phase AC electricity and has two wires - an "active" and a "neutral" [Theo. Audel and Co, 1998]…
CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" is also available. Order full work to download. Chapter two of "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" consists of the literature review. In this chapter all the related work on "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" was reviewed.
CHAPTER THREE: The complete chapter three of "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" is available. Order full work to download. Chapter three of "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.
CHAPTER FOUR: The complete chapter four of "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" is available. Order full work to download. Chapter four of "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" consists of all the test conducted during the work and the result gotten after the whole work
CHAPTER FIVE: The complete chapter five of design and construction of a "design and construction of an automatic 3 phase supply monitoring system with high and low voltage protection" is available. Order full work to download. Chapter five of "comparative analysis of bitter kola, moringa oleifera seed, and wonderful kola used for waste water treatment" consist of conclusion, recommendation and references.
To "DOWNLOAD" the complete material on this particular topic above click "HERE"
Do you want our Bank Accounts? please click HERE
To view other related topics click HERE
To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE
Do you want us to research your new topic? if yes, click "HERE"
Do you have any question concerning our post/services? click HERE for answers to your questions
For more information contact us through any of the following means:
Mobile No: +2348146561114 or +2347015391124 [Mr. Innocent]
Email address: engr4project@gmail.com
Watsapp No: +2348146561114
COUNTRIES THAT FOUND OUR SERVICES USEFUL
Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124
Watsapp No: +2348146561114
Email Address: engr4project@gmail.com
FOLLOW / VISIT US VIA: