phonelogo+234 8146561114 or +2347015391124

DESIGN AND CONSTRUCTION OF AN AUTOMATIC SYNCHRONIZATION SYSTEM FOR LOW VOLTAGE GENERATORS

USER'S INSTRUCTIONS: The project work you are about to view is on "design and construction of an automatic synchronization system for low voltage generators". Please, sit back and study the below research material carefully. This project topic "design and construction of an automatic synchronization system for low voltage generators" have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "design and construction of an automatic synchronization system for low voltage generators" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "design and construction of an automatic synchronization system for low voltage generators" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

 

BY

---
--/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---



APPROVAL PAGE

This is to certify that the research work, "design and construction of an automatic synchronization system for low voltage generators" by ---, Reg. No. --/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.

By
---                                                     . ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work "design and construction of an automatic synchronization system for low voltage generators" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "design and construction of an automatic synchronization system for low voltage generators" visible for everyone, then the complete material on "design and construction of an automatic synchronization system for low voltage generators" is to be ordered for. Happy viewing!!!


ABSTRACT

In this study, an automatic synchronization unit has been developed for low voltage synchronous generators. Synchronous generators arealso connected in parallel with the line. The voltages, frequencies, phasese quences and synchron is time data have been transferred to the microcontroller. These data are monitored and evaluated by the control algorithm coded into the microcontroller. Synchronize (Parallel) operation of generators are realized automatically when all parallel connection conditions are occur. The system doesn’t require additional measuring tools for monitoring and control processes. The developed automatic synchronization unit is fast, cost effective, reliable and precise to be used for monitoring, measurement and parallel operation of the synchronousgenerators.  

 

TABLE OF CONTENTS
COVER PAGE
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRACT
CHAPTER ONE

    1.       INTRODUCTION
    2. BACKGROUND OF THE PROJECT
    3. PROBLEM STATEMENT
    4. AIM AND OBJECTIVE OF THE PROJECT
    5. PURPOSE OF THE PROJECT
    6. SIGNIFICANCE OF THE PROJECT
    7. PROBLEM/ LIMITATION OF THE PROJECT
    8. BENEFITS OF SYNCHRONIZATION OF GENERATORS
    9. SCOPE OF THE PROJECT
    10. DEFINITION TERMS
    11. PROJECT ORGANISATION

CHAPTER TWO
LITERATURE REVIEW

    1. OVERVIEW OF GENERATOR SYNCHRONIZATION
    2. CONDITIONS FOR SYNCHRONIZATION PROCESS
    3. REVIEW OF GENERATOR SYNCHRONIZATION METHODS
    4. SYNCHRONOUS OPERATION
    5. SYNCHRONOUS SPEEDS
    6. EFFECTS OF POOR SYNCHRONIZATION OF TWO AC GENERATORS

CHAPTER THREE
METHODOLOGY

    1. FACTORS CONSIDERED WHEN SYNCHRONIZING GENERATORS
    2. REQUIREMENTS FOR SYNCHRONIZING GENERATORS
    3. SYNCHRONIZING METHOD
    4. ANALYSIS AND OPERATION OF THESYNCHRONIZED GENERATORS
    5. AUTOMATIC SYNCHRONIZATIONUNIT

CHAPTER FOUR
4.0      RESULT ANALYSIS AND DISCUSSION

    1. ADVANTAGES OF PARALLEL GENERATOR SYSTEMS
    2. TECHNIQUES FOR SYNCHRONIZATION
    3. FAULTY GENERATOR SYNCHRONIZATION

CHAPTER FIVE

    1. SUMMARY
    2. CONCLUSION
    3. REFERENCES

CHAPTER ONE

  1.                   INTRODUCTION

1.1                                         BACKGROUND OF THE PROJECT
Electrical power systems consist of the interconnection of large numbers of synchronous generators operating in parallel, interconnected by transmission lines, and supplying large numbersof widely distributed loads. When a synchronous generator (SG) is connected to an interconnected system containing many other SGs, the voltage and frequency at its terminals are fixed by the system[1].
Some of the benefits of operating multiple generators in parallel include increased reliability, expandability, flexibility, serviceability and efficiency. The redundancy inherent in parallel power generation provides significantly greater reliability for critical loads. In a parallel configuration, if one generator  fails, the most critical loads are  redistributed among the other units in the system. Utilizing multiple smaller generators instead of a single large unit offers greater location flexibility. With multiple generators available, individual units can be taken out of service for repair or maintenance without losing standby power for critical circuits. Electrical machines operate at maximum efficiency value close to the rated load. If the load is too low, the efficiency of the SG will decrease. Parallel operation allows operating SGs around their rated load resulting operating with high efficiency [2,3].

Variety studies related to parallel operation and control of SGs have presented in the literature. These studies include simulation, power control, synchronization and stability of power system including SGs [4, 5]. A standard of synchronization used for power systems is given in [6]. Simulation of parallel connected SGs is presented in [7]. An automatic digital synchronization system has been proposed in [8]. Using sensors and PLC in the control unit increase the cost of the system. A control unit for the parallel operation of AC Generators is developed and presented in [9]. Zero crossing detectors are used for transmit voltage signals of generators to the microcontroller.
In this study, microcontroller based an automatic synchronization unit has been developed for the parallel operation of SGs. The control unit read calculates and evaluates the frequency, voltage, phase sequence of the received input signals and then provides the synchronization for the monitoring parallel connection conditions and parallel operation of generators. The program coded into the microcontroller has developed  effectively  to eliminate the interface electronics circuit from the system.

Parallel operation of generators is achieved automatically with the control unit when all parallel connection conditions occur. There is no need to use measuring tools, such as voltmeters, frequency  meters, phase sequence meter, and synchroscope for monitoring the parallel connection conditions. The proposed automatic synchronization unit is cost effective, quick, reliable, stable and accurate to be used for monitoring, measurement and parallel operation of theSGs.
1.2                                                  PROBLEM STATEMENT
When two ac generators are used to supply energy, It is not possible for the generator to supply power to the electric power system unless or until its voltage, frequency, and other parameters are exactly matched with the network. It is the process of matching parameters such as voltage, frequency, phase angle, phase sequence and waveform of the generator or other sources with a healthy or running power system is known as synchronization.
AC generators have to be synchronized with the grid before being attached to the grid. An out-of-phase generator connecting to the grid would cause a sudden power surge, possibly damaging the grid and/or the generator.
1.3                                    AIM AND OBJECTIVE OF THE PROJECT
AIM
The main aim of this work is to build an automatic synchronization system for low voltage generators.
OBJECTIVES
The objectives of this study are:

  1. To study the  matching the speed and frequency of a generators.
  2. To study structure and principle of operation synchronize generators
  3. To learn how to connect generators to utility grid or to another generator

1.4                                              PURPOSE OF THE PROJECT
The purposes of synchronizing generators are to provide reliability, expand demand, efficiency, expanding capacity, and meeting up with load requirement.
1.5                                         SIGNIFICANCE OF THE PROJECT
This study has made us to understand how generators synchronization increases the reliability of the power system and allows one or more generators to be removed for shutdown or preventive maintenance
1.6                                PROBLEM/ LIMITATION OF THE PROJECT
Poor synchronization causes disturbances in the power system as well as severe damages to the generator and transients in power system. It damages the prime mover and generator because of mechanical stresses caused by rapid accelerationor deceleration. It causes high currents that can cause damage to transformers, power lines and the generator. In the absence of protection schemes, these faults can spread in whole power systemthusleadingtoablackout.

1.7        BENEFITS OF SYNCHRONIZATION OF GENERATORS

The reasons for synchronization of Generators are enumerated below.

Reliability

Several small units are more reliable than single large unit. This is because, if one alternator is failed, other alternators are still active and hence the whole system will not be shutdown.

Continuity of Service

In case of periodic maintenance, break-down, or repairs of one alternator, it must be shutdown and removed from service. Since the other machines are operating in a synchronize manner, the interruption to supply the load is prevented.

Load Requirements

The load requirements in the central station changes continuously. During light-load periods only one or two generators are operated to supply the load demands. During peak-load demands, other alternators are synchronized to meet the demand.

High Efficiency

Generators run most efficiently when they are loaded at their rated values. Due to the operation of few generators at light-loads and more generators at high peak loads efficiently loads the generators.

Expanded Capacity

As the demand for electric power is increasing continuously, utility companies have been increasing the physical size of the generating plants by adding more alternators. So these alternators have to be connected in synchronize manner with the existing generator equipment.
1.8                                  SCOPE OF THE PROJECT
Connecting generators in parallel increases the power capacity, control in load management, ease of maintenance, and redundancy. The process involves the physical connection of two or more electric generators, and the synchronization of their outputs. The synchronization matches the waveform of the output voltage of one generator with the voltage waveform of the other generator(s).
When a synchronous generator is connected to a power system, the power system is often so large that nothing the operator of the generator does will have much of an effect on the power system. An example of this situation is the connection of a single generator to the Canadian power grid. Our Canadian power grid is so large that no reasonable action on the part of one generator can cause an observable change in overall grid frequency. This idea is idealized in the concept of an infinite bus. An infinite bus is a power system so large that its voltage and frequency do not vary regardless of how much real or reactive power is drawn from or supplied to it.
1.10                                                  DEFINITION TERMS
HV: High Voltage. This is when any electricity supply in excess of 650volts. Primarily used for the transmission of electricity over long distances.
Kva: Kilo volt amps. A measurement of the electrical ‘pressure’ and ‘quantity’ to a building.
Loads:  This is an equipment that is using the electricity supplied to a building.
LV:  Low Voltage. This is an Electricity supply from 110volts to 650 volts.
Power cut: this is a failure of the mains electricity by factors outside of your premises.
Single phase power: This is the electricity produced from one phase of a three phase winding or from a dedicated singles phase winding.
Winding: This is the copper wire that produces electricity when it passes through a magnetic field.
Watts: this is the total energy supplied by a circuit.
AVRs.Automatic voltage regulators.The electronic device which controls the output voltage of an alternator.
Base load rating.The rating given to a generator when it is used for continuous supply of electricity at a given load 24/7.
Black out. A national or wide area power failure, causing major disruption.For example.
Brown out.A drop in the mains voltage (not a total failure) that can cause degradation of lighting and electronic equipment.
1.11                                                      PROJECT ORGANISATION
The work is organized as follows: chapter one discuses the introductory part of the work,   chapter two presents the literature review of the study,  chapter three describes the methods applied,  chapter four discusses the results of the work, chapter five summarizes the research outcomes and the recommendations.


CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of "design and construction of an automatic synchronization system for low voltage generators" is also available. Order full work to download. Chapter two of "design and construction of an automatic synchronization system for low voltage generators" consists of the literature review. In this chapter all the related work on "design and construction of an automatic synchronization system for low voltage generators" was reviewed.

CHAPTER THREE: The complete chapter three of "design and construction of an automatic synchronization system for low voltage generators" is available. Order full work to download. Chapter three of "design and construction of an automatic synchronization system for low voltage generators" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of "design and construction of an automatic synchronization system for low voltage generators" is available. Order full work to download. Chapter four of "design and construction of an automatic synchronization system for low voltage generators" consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of "design and construction of an automatic synchronization system for low voltage generators" is available. Order full work to download. Chapter five of "design and construction of an automatic synchronization system for low voltage generators" consist of conclusion, recommendation and references.

 

CLICK HERE FOR MORE RELATED TOPICS/MATERIAL


To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions


For more information contact us through any of the following means:

Mobile No phonelogo:+2348146561114 or +2347015391124 [Mr. Innocent]

Email address emailus:engr4project@gmail.com

Watsapp No whatsapp.html :+2348146561114


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124

Watsapp Nowhatsapp.html
:+2348146561114


E
mail Address emailus:engr4project@gmail.com


FOLLOW / VISIT US VIA:

tweeter instagram.htmlfacebook logomyyoutubelogo.html