DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE-OVER FOR THREE PHASES USING 555 TIMER AND CONTACTOR

USER'S INSTRUCTIONS: The project work you are about to view is on "design and construction of automatic change-over for three phases using 555 timer and contactor". Please, sit back and study the below research material carefully. This project topic (design and construction of automatic change-over for three phases using 555 timer and contactor) have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "design and construction of automatic change-over for three phases using 555 timer and contactor" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "design and construction of automatic change-over for three phases using 555 timer and contactor" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

DESIGN AND CONSTRUCTION OF AUTOMATIC CHANGE-OVER FOR THREE PHASES USING 555 TIMER AND CONTACTOR

BY

---
--/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---

DECEMBER,2018



APPROVAL PAGE

This is to certify that the research work, "design and construction of automatic change-over for three phases using 555 timer and contactor" by ---, Reg. No. --/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.

By
---                                                     . ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work "design and construction of automatic change-over for three phases using 555 timer and contactor" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "design and construction of automatic change-over for three phases using 555 timer and contactor" visible for everyone, then the complete material on "design and construction of automatic change-over for three phases using 555 timer and contactor" is to be ordered for. Happy viewing!!!


ABSTRACT

The main aim of any electric power supply in the world is to provide uninterrupted power supply at all times to all its consumers. Although in developing countries, the electric power generated to meet the demands of the growing consumers of electricity is insufficient hence instability and outage.
        Power instability or outage in general does not promote development in the public and private sector. The inventors do not feel secure to come into a country with constant or frequent power failure.
        These limit the development of industries. In addition, there are processes that cannot be interrupted because of their importance. For instance, surgery operation in hospitals, transfer of money between bank and lots more. Power instability and outage in developing countries (Nigeria) creates a need for alternative source of power to backup the main supply.
        Automatic changeover switches find a wide application scope wherever the reliability of electric supply from the utilities is low and it is used in lighting motor circuits wherever continuity of supply is necessary. For switching to an alternative source from main supply and vice versa.
        This project is a design of an automatic changeover switch this means that when there is any mains failure, the automatic changeover switch will change to an alternative power supply (GENERATOR) and back to the main supply when it is restored.
        The purpose of this project is to maintain constant supply to the main circuit that is being supplied by making up for the time delay that usually accompanies the manual switching from one source to another.
        The design comprises of the power connection circuit and control connection circuit. The main components to be used include contactor, relay, timers, rectifiere.t.c.


TABLE OF CONTENTS
Title Page                                                                          i
Certification                                                                        ii
Acknowledgements                                                             iii
Abstract                                                                             iv
Table of Contents                                                               v

CHAPTER ONE
1.1    Introduction                                                               1
1.2    Aim and Objective of the Project                                   3
1.3    Scope of the Project                                                    3
CHAPTER TWO
2.1    Literature Review                                                                5
2.2    Manual Change-over Switch                                                 5
2.3    Automatic Change-over Switch                                     6
2.4    Related Work                                                             10
2.5    Reasons for Automatic Change-over Switch                   16
2.6    Problems of Automatic Change-over Switch                   17

CHAPTER THREE
3.1    Methodology (Material and Methods)                            18
3.2    Circuit Conductor                                                                18
3.3    Circuit Breaker                                                            19
3.4    Reset Timer                                                               20
3.5    Contactor                                                                   21
3.6    Operation of Timer Delay                                             24
3.7    Principle of Operation                                                  25
CHAPTER FOUR
4.0    Construction                                                               29
4.1    List of Component Used                                               29
4.2    Vero Board                                                                 29
4.3    Bread Board                                                               30
4.4    Soldering Iron                                                            33
4.5.1 Testing, Maintenance and Discussion                            36
4.5.2 Polarity Test                                                               36
4.5.3 Insulation Resistance Test between the Live and Neutral Conductors                     37
4.5.4 Earthling Test                                                             37
4.6    Maintenance of Contactor and Installation                      37    
CHAPTER FIVE
5.1    Conclusion                                                                 39
5.2    Recommendation                                                        39
References                                                                40
Bill of Engineering Measurement and Evaluation (BEME) 41


CHAPTER ONE
1.1   INTRODUCTION
Power instability in developing countries creates a need for automation of electrical power generation or alternative sources of power to back-up the utility supply. This automation is requiring as the rate of power outages become predominantly high. Research in the field of electrical electronics engineering has led to the tremendous discovers and inventions especially in the area of automation and power control. These invention have been useful in solving the over-in.
Creating problem posed by power generation, distribution and control, which has been a cause of concern especially in the third world countries (developing countries) like Nigeria. Most industrial and commercial process is dependents on electric power and if process of a change-over is manual, serious time is not only wasted but it creates room for human error (in the area of change over connections) which could result in great economic loss.
This project is all about the construction of an automatic generator change-over panel with timer which aids in the switching over to alternation power supply authority i.e.Power Holding Company of Nigeria (PHCN) popularly known as NEPA which is the main power regulating body in Nigeria. This project consist of circuit breakers, electromagnetic contactor which carry heavy load current relay which work with the principle of electromagnetic induction  because it will receive electrical signal to trigger and neumatic timer all incorporated and interconnected to achieve the desire goal.
Also this project is constructed in such a way that provision is made for manually operation (it can be operated manually) when necessary for required for example, in the situation whereby voltage supplied by the authority (PHCN) is fluctuating and one may decided not to use it, so the constructed automatic change-over panel can be permanently switch to generator set temporarily pending the time that utility supply is stable moreover in the hospital where where surgery operations is needed to be carry out and power outage for even five second cause damages, one may decide to neglect the supply from authority (PHCN) and permanently switch the panel to manual operation pending the time or period by which surgery operation is completed. During the pending period this change-over will be working continuously in manual operation. Fill someone or the operation has to switch over to automatic operation. As said earlier, provision is made for these types of generation in this project and there is separate switch that performed the function.

1.2   AIM AND OBJECTIVE OF THE PROJECT
The aim of the project is to design and construction automatic change-over switch load from the mains power supply (PHCN) to a backup power supply (Generator) with simplicity.
The advantages of this project cannot be over emphasized, since outage is a major problem is the advent developing nations like Nigeria, for example, power failure of minute in an airport terminal can create losses that could run into millions of dollars due to loss in air traffic system control the ability for back-up to start and change-over automatically becomes imperative under such circumstances.
Also, this project could play a large role in the security in banks and companies i.e. an outage of up to ten minute in an organized setup is enough to do all the damage required with such an automatic change-over device in place the generator backup would no longer have to depend on security men and of course reduced fear of system breakdown in the companies there by ensuring smooth running of economics activities.

1.3   SCOPE OF THE PROJECT

Basically, this project is a three phase automatic change-over device with the power capacity of 50KVA. Generator as deducted from my calculations it shows that generator of power rating ranging from 0.5KVA to 50KVA is required to be use for this project though the contacts of electromagnetic contactor relays and circuit breakers. Also the maximum load current should be between the ratings of 10A to 90A load current. Therefore the use of 10Amperes in this project is because of future extension.


1.4                                 DEFINITION OF TERMS
CHANGEOVER: Generally, a changeover is a system which could be operated manually or automatically , that changes one source of power supply to another source in case of power failure from either of the four sources.
RELAY: relay is one of the major components used in this work which is an electrical device, typically incorporating an electromagnet, which is activated by a current or signal in one circuit to open or close another circuit.
POWER FLUCTUATIONS: is a periodic dip or spikes in the electrical current of any given circuit.
POWER FAILURE: is a short- or long-term loss of the electric power to an area.    

1.5                                PROJECT WORK ORGANISATION
The various stages involved in the development of this project have been properly put into five chapters to enhance comprehensive and concise reading. In this project thesis, the project is organized sequentially as follows:
Chapter one of this works is on the introduction to this study. In this chapter, the background, significance, objective limitation and problem of this study were discussed.
Chapter two is on literature review of this study. In this chapter, all the literature pertaining to this work was reviewed.
Chapter three is on design methodology. In this chapter all the method involved during the design and construction were discussed.
Chapter four is on testing analysis. All testing that result accurate functionality was analyzed.
Chapter five is on conclusion, recommendation and references.

 

CHAPTER FIVE
5.1   CONCLUSION
The automatic change-over switch has immense advantage in every area where power is required it is a fact that there is hardly any aspect of human life were electrical power is not required, at home, offices, hospital, etc.
It find a wide application scope, wherever the re-ability of electrical supply is necessary, for switching to an alternative source from main.

5.2   RECOMMENDATION
The automatic change-over switch is needed in every home and offices because of the fact that it’s reliable, it’s durable, and it’s affordable and is ability to provide immediate automatic switching from the public power source to other sources.
It is recommended that further work be done on this change-over switch on large scale, for instant an automatic change-over switch that can be use in an industry.

 


CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of "design and construction of automatic change-over for three phases using 555 timer and contactor" is also available. Order full work to download. Chapter two of "design and construction of automatic change-over for three phases using 555 timer and contactor" consists of the literature review. In this chapter all the related works on "design and construction of automatic change-over for three phases using 555 timer and contactor" were reviewed.

CHAPTER THREE: The complete chapter three of "design and construction of automatic change-over for three phases using 555 timer and contactor" is available. Order full work to download. Chapter three of "design and construction of automatic change-over for three phases using 555 timer and contactor" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of "design and construction of automatic change-over for three phases using 555 timer and contactor" is available. Order full work to download. Chapter four of "design and construction of automatic change-over for three phases using 555 timer and contactor" consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of design and construction of a "design and construction of automatic change-over for three phases using 555 timer and contactor" is available. Order full work to download. Chapter five of "design and construction of automatic change-over for three phases using 555 timer and contactor" consist of conclusion, recommendation and references.

 

CLICK HERE FOR MORE RELATED TOPICS/MATERIAL


To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions


For more information contact us through any of the following means:

Mobile No phonelogo:+2348146561114 or +2347015391124 [Mr. Innocent]

Email address emailus:engr4project@gmail.com

Watsapp No whatsapp.html :+2348146561114


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124

Watsapp Nowhatsapp.html
:+2348146561114


E
mail Address emailus:engr4project@gmail.com


FOLLOW / VISIT US VIA:

tweeter instagram.htmlfacebook logomyyoutubelogo.html