phonelogo+234 8146561114 or +2347015391124

DESIGN AND CONSTRUCTION OF AUTOMATIC LOAD CONTROLLER AND MONITORING DEVICE

USER'S INSTRUCTIONS: The project work you are about to view is on "design and construction of automatic load controller and monitoring device". Please, sit back and study the below research material carefully. This project topic "design and construction of automatic load controller and monitoring device" have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "design and construction of automatic load controller and monitoring device" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "design and construction of automatic load controller and monitoring device" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

 

BY

---
--/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---



APPROVAL PAGE

This is to certify that the research work, "design and construction of automatic load controller and monitoring device" by ---, Reg. No. --/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.

By
---                                                     . ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work "design and construction of automatic load controller and monitoring device" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "design and construction of automatic load controller and monitoring device" visible for everyone, then the complete material on "design and construction of automatic load controller and monitoring device" is to be ordered for. Happy viewing!!!


ABSTRACT

Electricity demands in hospitals and other public places are characterized by their need for high quality, guaranteed supplies. The existence of captive electricity uses and the size and regularity of the electrical and heat loads required by hospitals are aspects that could well buttress the possibility of installing cogeneration plants fired by natural gas (CHP).
The purpose of this project is to estimate the CHP technical potential in hospitals. Based on a classification of hospitals by specific energy consumption indicators, this potential are assessed, taking into consideration gas fueled engines associated with absorption cooling systems. A potential figure of approximately 500 MWe was obtained, whose effective implementation runs up against the obstacles inherent to hospital sector.
 Electricity demands in hospitals and other public places are characterized by their need for high quality, guaranteed supplies. The existence of captive electricity uses and the size and regularity of the electrical and heat loads required by hospitals are aspects that could well buttress the possibility of installing cogeneration plants fired by natural gas (CHP).
This work is a microcontroller based. The microcontroller based load sharing and control system is a device that automatically controls overload on a generator by sharing power and cut off supply once the power consumption exceeds the amount of power supplied. The control system for controlling the AC loads will be selected within a power range of 500W. This is achieved by using a microcontroller PIC16F877A to automatically detect an overload and subsequently cut off supply. The method used in the project provides necessary stages from overload detection to switching/cutting off supply. The main aim of the work is to provide a non-interrupted power supply to the energy consumers. By implementation of this scheme the problem of interruption of supply due to generator overloading can be avoided. The work was fairly successful and there liability level expected is commendable as this may also create room for improvement. The project was tested and observed that it cut off supply as soon as the microcontroller senses an overload on the system by the user.

 

TABLE OF CONTENTS

 TITLE PAGE

APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRCT
TABLE OF CONTENT

CHAPTER ONE

    1. INTRODUCTION
    2. BACKGROUND OF THE PROJECT
    3. PROBLEM STATEMENT
    4. AIM OF THE PROJECT
    5. PURPOSE OF THE PROJECT
    6. SCOPE OF THE PROJECT
    7. SIGNIFICANCE OF THE PROJECT
    8. DISADVANTAGES  OF THE PROJECT
    9. METHODOLOGY
    10. PROJECT ORGANISATION

CHAPTER TWO

LITERATURE REVIEW
2.0      LITERATURE REVIEW
2.1      OVERVIEW OF THE STUDY
2.2      EFFECT OF EXCESS LOAD ON POWER GENERATING EQUIPMENT
2.3      HISTORICAL BACKGROUND OF THE STUDY
2.4      WHY THE ELECTRICAL SUPPLY CAPACITY IS LESS THAN DEMAND
2.5      LOAD S SHARING PROCEDURES
2.6      TYPES OF LOAD SHARING
2.7      REVIEW OF THE RELATED STUDY
CHAPTER THREE

3.0      CONSTRUCTION METHODOLOGY
3.1      SYSTEM BLOCK DIAGRAM

3.2      MICROCONTROLLER DESIGN
3.3      INTERFACING LCD TO PIC16F877A
3.4      CIRCUIT DIAGRAM
3.5      SOFTWARE IMPLIMENTATION
3.6      COMPONENTS DESCRIPTION
37       POWER SUPPLY

CHAPTER FOUR

4.0       RESULT ANALYSIS

4.1      TESTING AND RESULTS
4.2      ASSEMBLING OF SECTIONS
4.3      CONSRUCTION OF THE CASING
4.4      TESTING OF SYSTEM OPERATION
4.5    INSTALLATION OF THE COMPLETED DESIGN
4.6    DISCUSSION

CHAPTER FIVE

    1. CONCLUSIONS
    2. RECOMMENDATION

5.3     REFERENCES

CHAPTER ONE

  1. INTRODUCTION

1.1                          BACKGROUND OF THE PROJECT
Electricity is an extremely handy and useful form of energy. It plays an ever growing role in our modern industrialized society. The electrical power systems are highly non-linear, extremely huge and complex networks [1]. Such electric power systems are unified for economical benefits, increased reliability and operational advantages. They are one of the most significant elements of both national and global infrastructure, and when these systems collapse it leads to major direct and indirect impacts on the economy and national security [2]. This makes one to realize that if load is increasing rapidly and power generation is constant then it is not possible for the system to drive the future needs. For this reason distributed power generations is receiving an attention of the researchers around the globe to be used in remote and rural areas [3].
A power system consists of components such as generators, lines, transformers, loads, switches and compensators. However, a widely dispersed power sources and loads are the general configuration of modern power systems. Electric power systems can be divided into two sub- systems, namely, transmission systems and distribution systems. The main process of a transmission system is to transfer electric power from electric generators to customer area, whereas a distribution system provides an ultimate link between high voltage transmission systems and consumer services. This generator can supply important domestic or industrial loads during power shortages. One problem facing generator usage is overloading by consumers which affects the efficiency of the generator. To improve the quality of power with sufficient solutions, it is necessary to be familiar with what sort of constraint as occurred. Additionally, if there is any inadequacy in the protection, monitoring and control of a power system, the system might become unstable. The problems of overloading, voltage variation and heating effects are very common. It takes a lot of time for its repair and also involves lot of expenditure. This work is all about protecting the generator from overload condition. Therefore, it necessitates a monitoring system that is able to automatically detect, monitor, typify and classify the existing constraints on the generator. The introduction of the power sharing and monitoring unit will help to protect the generator against overload by different consumers and automatically disconnect the consumer when the load exceeds the maximum power demand to the particular consumer.

1.2    PROBLEM STATEMENT
In today’s world, there is a continuous need for automatic appliances with the increase in standard of living, there is a sense of urgency for developing circuits that would ease the complexity of life.
The project is designed to operate or control an electrical load multiple number of times as per the program. It overcomes the difficulties of switching the load ON/OFF manually.
Load shedding is what electric utilities do when there is a huge demand for electricity that exceeds the supply.

1.3      AIM OF THE PROJECT
The main aim of this work is to build a microcontroller based device the that control on/off a power supply whenever there is excess load on the system.

1.4    PURPOSE OF THE PROJECT
This project is required for load sharing time management which is used when the electricity demand exceeds the supply and there comes a need for manually switching ON/OFF the electrical devices in time. However the purpose of the system is to eliminates the manual operation by automatically switching the load ON/OFF.

1.5   SCOPE OF THE PROJECT
Programmable automatic load controller and sharing system is a reliable circuit that takes over the manual task of switch ON/OFF the electrical devices with respect to time. Power sharing and monitoring unit will help to protect the generator against overload by different consumers and automatically disconnect the consumer when the load exceeds the maximum power demand to the particular consumer.

1.6  SIGNIFICANCE OF THE PROJECT

  1. Prevents overloading and damage of the power generators
  2. Prevents instability and system collapse of the electrical generation and distribution systems
  3. Ensures that consumers or parts of the network have power as opposed to a total blackout.
  4. The planned schedules ensure that available capacity is shared fairly and each consumer gets power at one time or another.
  5. It serves as a warning to the utility hence forcing them to increase capacity, and efficiency so as to meet the demand.

1.7   DISADVANTAGES OF LOAD SHEDDING
I. One another major problem in our society created by load sharing is safety. Even though this point looks far fetched it is a dangerous problem. People in our society not only work at day but have night shifts as well. These people face serious threat from attackers at night specially walking down dark narrow lanes with no light. They can be easy prey to any thieves or robbers.
ii. The other disadvantage is that the students are going to have a hard time studying without light. Our country’s future looks dark if the students who are to lead the country in future are deprived of the basic infrastructure which helps them move forward. Load shedding not only stops them from reading and writing but blocks the path to them getting knowledge through internet, television etc.
iii. Other disadvantages can be people and hospitals having problems with their day to day activities. Offices not being able to run properly, people not being able to do their work on time. These are only branches of a huge problem our country faces. The root problem could lead to financial breakdown and an economic misbalance in the country with all the importing of electricity and everything.

  1. The utilities may not increased the output
  2. Restoring the load may cause more instabilities

1.8          METHODOLOGY
To achieve the aim and objectives of this work, the following are the steps involved:

  1. Study of the previous work on the project so as to improve it efficiency.
  2. Draw a block diagram.
  3. Test for continuity of components and devices,
  4. programming of microcontroller
  5. Design and calculation for the changeover was carried out.
  6. Studying of various component used in circuit.
  7. Construct a digital changeover circuit.
  8. Finally, the whole device was cased and final test was carried out.

1.9           PROJECT ORGANISATION
The work is organized as follows: chapter one discuses the introductory part of the work,   chapter two presents the literature review of the study,  chapter three describes the methods applied,  chapter four discusses the results of the work, chapter five summarizes the research outcomes and the recommendations.

CHAPTER FIVE
5.1                                                           CONCLUSION
The proposed work provides an efficient way for load sharing and control at real time. The micro controller based load sharing and control system is a system designed specifically to monitor over load on generator. The design scheme consists of dual load system capable of supplying 500w load maximum each. This was achieved by the use of some solid state components like micro controller, transistors, LCD display, resistors and relays. The method used in the project provides necessary stages from overload detection to switching/cutting off supply. The work was fairly successful and there liability level expected is commendable as this may also create room for improvement. The project was tested and observed that it cut off supply as soon as the micro controller senses an over load on the system by the user. In future the work can be modified by using switch gear to monitor high power load. The micro controller program can also be modified to store or long the time, at a particular period (e.g. weekly, or monthly). The power supplied to each load can be modified to be more than 500w to accommodate higher power demands.

 


CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of "design and construction of automatic load controller and monitoring device" is also available. Order full work to download. Chapter two of"design and construction of automatic load controller and monitoring device"consists of the literature review. In this chapter all the related work on "design and construction of automatic load controller and monitoring device" was reviewed.

CHAPTER THREE: The complete chapter three of "design and construction of automatic load controller and monitoring device" is available. Order full work to download. Chapter three of "design and construction of automatic load controller and monitoring device" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of "design and construction of automatic load controller and monitoring device" is available. Order full work to download. Chapter four of "design and construction of automatic load controller and monitoring device" consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of "design and construction of automatic load controller and monitoring device" is available. Order full work to download. Chapter five of "design and construction of automatic load controller and monitoring device" consist of conclusion, recommendation and references.

 

CLICK HERE FOR MORE RELATED TOPICS/MATERIAL


To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions


For more information contact us through any of the following means:

Mobile No phonelogo:+2348146561114 or +2347015391124 [Mr. Innocent]

Email address emailus:engr4project@gmail.com

Watsapp No whatsapp.html :+2348146561114


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124

Watsapp Nowhatsapp.html
:+2348146561114


E
mail Address emailus:engr4project@gmail.com


FOLLOW / VISIT US VIA:

tweeter instagram.htmlfacebook logomyyoutubelogo.html