+234 8146561114 (MTN) or
+2347015391124 (AIRTEL)

DESIGN AND CONSTRUCTION OF  ENERGY BASED PREPAID METER USING GSM

USER'S INSTRUCTIONS: The project work you are about to view is on "design and construction of energy based prepaid meter using gsm " Please, sit back and study the below research material carefully. This project topic "design and construction of energy based prepaid meter using gsm " have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "design and construction of energy based prepaid meter using gsm " project research material is to reduce the stress of moving from one school library to another all in the name of searching for "design and construction of energy based prepaid meter using gsm " research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

DESIGN AND CONSTRUCTION OF  ENERGY BASED PREPAID METER USING GSM

BY

---
EE/H2013/01430
DEPARTMENT OF ---
INSTITUTE OF ---

DECEMBER,2018



APPROVAL PAGE

This is to certify that the research work, "design and construction of energy based prepaid meter using gsm " by ---, Reg. No. EE/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on Electrical and Electronics Engineering has been approved.

By
Dr. ---                                           Dr. ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
Dr. ---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work “design and construction of energy based prepaid meter using gsm ” research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of “AA” visible for everyone, then the complete material on “design and construction of energy based prepaid meter using gsm ” is to be ordered for. Happy viewing!!!


ABSTRACT

 

ABSTRACT
It is realized that one of the defective subsystems adding to the tremendous budgetary loss in Power Supply Company is the conventional metering and charging framework. Mistakes get presented at each phase of charging the energy rates, similar to blunders with conventional meters, reading errors by human while noticing the consumed energy; and blunder during the preparation of paid and the due bills. The solution for this downside is a prepaid charging or billing framework of consumed energy. Most of the developing countries are shifting their conventional energy management practices to the modern one by replacing the old and conventional energy meters with the smart meters outfitted with the prepaid facility to quantify the power consumption so as to decrease the income deficits looked by utilities because of customer unwillingness to make consumed energy payments on time. This proposed design embedded with GSM technology is advancement over conventional energy meter, which enables consumer to effectively manage their electricity usage. This device enables consumers to recharge the electricity balance, just by sending a SMS. It can also disconnect the home power supply connection, if there is low or zero balance in the system.

TABLE OF CONTENTS
COVER PAGE
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRACT
CHAPTER ONE
1.0      INTRODUCTION
1.1      BACKGROUND OF THE PROJECT

    1. PROBLEM STATEMENT
    2. AIM AND OBJECTIVE OF THE PROJECT
    3. PURPOSE OF THE PROJECT
    4. SIGNIFICANCE OF THE PROJECT
    5. APPLICATION OF THE PROJECT
    6. BENEFIT OF THE PROJECT
    7. PROJECT ORGANISATION

CHAPTER TWO
LITERATURE REVIEW

    1. HISTORICAL BACKGROUND OF AN ELECTRIC METER
    2. REVIEW OF UNIT OF MEASUREMENT
    3. OTHER UNITS OF MEASUREMENT
    4. TYPES OF METERS
    5. REVIEW OF RELATED STUDY
    6. REVIEW OF NINE DIGIT LCD DISPLAY
    7. PARTS OF FIRE ALARM

CHAPTER THREE
3.0      METHODOLOGY
3.1      BLOCK DIAGRAM
3.2      CIRCUIT DIAGRAM
3.3      CIRCUIT OPERATION
3.4     CIRCUIT DESCRIPTION
3.5      PARTS LIST
3.5     HOW TO CONNECT ENERGY METER WITH ARDUINO
3.6      CALCULATION OF PULSES AND UNITS
3.7      PROGRAMING EXPLANATION
3.8      METER SETUP BLOCK DIAGRAM
3.9      METER SETUP WIRING DIAGRAM
3.10   POWER SUPPLY UNIT

CHAPTER FOUR

4.0      TESTING AND RESULTS

    1. CONSTRUCTION PROCEDURE AND TESTING
    2. ASSEMBLING OF SECTIONS
    3. CASING AND PACKAGING
    4. MOUNTING PROCEDURE
    5. TESTING

4.6   BILL OF ENGINEERING MEASUREMENTS AND EVALUATION

CHAPTER FIVE

    1. CONCLUSION
    2. RECOMMENDATION
    3. REFERENCES

CHAPTER ONE
1.0                                                        INTRODUCTION
1.1                                         BACKGROUND OF THE PROJECT
Electric energy consumed by the power devices is measured by a gadget known as an energy meter. Since 1980s, the energy meter’s journey started. When there were large energy meters which have been made with lots of innovations in energy meters to reduce its size and also the weight. Particularly, enhancement in accuracy, specifications and features of energy meters has been a topic of discussion.
In Nigeria, electromechanical energy meters were used for a long time. These meters work by checking and figuring the quantity of turns of an electrically directing metal plate which is made to rotate at a speed in respect to the power experiencing the meter. Those electromechanical energy meters are being supplanted by the newly digitized meters due to different problems like there is no way to upgrade those energy meters, its accuracy was limited and those meters were easy to manipulate because direction of revolving disc can be easily reversed.
Nowadays, digital energy meters can measure voltage, current and power also but electromechanical energy meters can only measure active power. Digital meters measure energy usage by highly integrated circuits, by capitalizing the voltage and current that gives the instantaneous power in watts. Digital meters show usage of electricity in digits on a liquid crystal display and those meters are highly accurate, inexpensive, theft reluctant, etc. The latest form of digital meter is the prepaid meter.
A prepaid electricity meter is a KWH (Kilowatt Hour) meter, measuring electrical consumption. The main difference is that this KWh meter counts backwards as the electricity is consumed and has a relay (an automatic switch) which disconnects the power when the KWh reading on the meter reaches zero. It further incorporates hardware which has the ability to decipher the pin number entered and convert it to KWh.
In this work we are focusing on Prepaid Electricity Energy Meter using GSM which is a good concept in which you can recharge its balance, like we do in our mobile phones. In this project we are building a automated system by using Arduino and GSM module. You can recharge the electricity balance through this system, just by sending a SMS. It can also disconnect the home power supply connection, if there is low or zero balance in the system. And this system will reads the energy meter readings and automatically send some updates to user’s mobile phone like low balance alert, cut off alert, resume alert and recharge alert.


1.2                                                PROBLEM STSATEMENT
There are many problem associated with the conventional meter. Following are some problems observed in those energy meters which should be rectified by using GSM based prepaid meter:

  1. Meter reading and other related tasks like bill payment are performed by a large number of staff i.e., large number of employees are required.
  2. An expansive number of staff is utilized for meter reading and other related assignments like bill payment.
  3. Billing errors due to carelessness of meter readers during meter reading and sometime billing estimation.
  4. Consumer has to stand in queue for hours for bill payment.
  5. Careless usage of electricity by consumer who is unaware of its cost.
  6. Consumers are not bound to pay bill on time

1.3                                  AIM AND OBJECTIVES OF THE PROJECT
At the end of this work, student involves shall be able to construct a digital types of electricity billing meter that sends electricity billing information to the user via SMS this device that does the following work: at the end of this work, students involved shall be:

  1. Able to build this device that does the above function.
  2. Able to learn how to embed arduino and GSM module with prepaid meter

1.4                                         SIGNIFICANCE OF THE PROJECT
The functions of this device are what make it different from other types of prepaid meter. Such functions are:

  1. It recharge  electricity balance through SMS,
  2. It can also connect or disconnect the home power supply connection, if there is low or zero balance in the system.
  3.  And this system will reads the energy meter readings and automatically send some updates to user’s mobile phone like low balance alert, cut off alert, resume alert and recharge alert.

http://www.prepaidmetering.co.za/widgets/spacer.gif

1.5                                              PURPOSE OF THE PROJECT
The main purpose of this work is to provide a simple, low cost and easy means of recharging, monitoring or reading our energy consumed in our homes, offices or industries
1.6                                              BENEFITS OF THE PROJECT
There are many benefits of this project:

  1. Pay according to your current income situation.
  2. Reduce electricity consuming when income is tight.
  3. No billing errors.
  4. No debt money.
  5. No need of extra staff for meter reading.
  6. Customer will be responsible for disconnections.

1.7                                          APPLICATION OF THE PROJECT
This device can be used in places, such as:

  1. Homes
  2. Offices
  3. Workshops
  4. Industries
  5. Worshiping centres, etc.

1.8                                                         PROJECT ORGANISATION
The work is organized as follows: chapter one discuses the introductory part of the work, chapter two presents the literature review of the study,  chapter three describes the methods applied,  chapter four discusses the results of the work, chapter five summarizes the research outcomes and the recommendations.

 

CHAPTER TWO: The complete chapter two of “design and construction of energy based prepaid meter using gsm ” is available. Order full work to download. Chapter two of “design and construction of energy based prepaid meter using gsm ” consists of the literature review. In this chapter all the related work on “design and construction of energy based prepaid meter using gsm ” was reviewed.

CHAPTER THREE: The complete chapter three of “design and construction of energy based prepaid meter using gsm ” is available. Order full work to download. Chapter three of “design and construction of energy based prepaid meter using gsm ” consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of “design and construction of energy based prepaid meter using gsm ” is available. Order full work to download. Chapter four of “design and construction of energy based prepaid meter using gsm ” consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of “design and construction of energy based prepaid meter using gsm ” is available. Order full work to download. Chapter five of “design and construction of energy based prepaid meter using gsm ” consist of conclusion, recommendation and references.



To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions

You can also visit our facebook Page at fb.me/hyclas to view our related construction (or design) picture.


For more information contact us through Any of the following means:

Mobile No :+2348146561114 or +2347015391124 [Mr. Innocent]

Email address :engr4project@gmail.com

Watsapp No :+2348146561114

To View Our Design Pix: You can also visit our facebook Page at fb.me/hyclas for our design photos/pics.


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124
Watsapp No
:+2348146561114

E
mail Address :engr4project@gmail.com


CLICK HERE FOR MORE RELATED TOPICS/MATERIAL

IF YOU ARE SATISFIED WITH OUR SERVICES, PLEASE DO NOT FORGET TO INVITE YOUR FRIENDS AND COURSEMATES TO OUR PAGE.