DESIGN AND CONSTRUCTION OF ENERGY BASED PREPAID METER
USER'S INSTRUCTIONS: The project work you are about to view is on "design and construction of energy based prepaid meter". Please, sit back and study the below research material carefully. This project topic (design and construction of energy based prepaid meter) have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "design and construction of energy based prepaid meter" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "design and construction of energy based prepaid meter" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.
TITLE PAGE
BY
---
--/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---
DECEMBER,2018
APPROVAL PAGE
This is to certify that the research work, "design and construction of energy based prepaid meter" by ---, Reg. No. --/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.
By
--- . ---
Supervisor Head of Department.
Signature………………. Signature……………….
……………………………….
---
External Invigilator
DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.
ACKNOWLEDGEMENT
The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.
PROJECT DESCRIPTION: This work "design and construction of energy based prepaid meter" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "design and construction of energy based prepaid meter" visible for everyone, then the complete material on "design and construction of energy based prepaid meter" is to be ordered for. Happy viewing!!!
It is realized that one of the defective subsystems adding to the tremendous budgetary loss in Power Supply Company is the conventional metering and charging framework. Mistakes get presented at each phase of charging the energy rates, similar to blunders with conventional meters, reading errors by human while noticing the consumed energy; and blunder during the preparation of paid and the due bills. The solution for this downside is a prepaid charging or billing framework of consumed energy. Most of the developing countries are shifting their conventional energy management practices to the modern one by replacing the old and conventional energy meters with the smart meters outfitted with the prepaid facility to quantify the power consumption so as to decrease the income deficits looked by utilities because of customer unwillingness to make consumed energy payments on time. This proposed design embedded with GSM technology is advancement over conventional energy meter, which enables consumer to effectively manage their electricity usage. This device enables consumers to recharge the electricity balance, just by sending a SMS. It can also disconnect the home power supply connection, if there is low or zero balance in the system.
CHAPTER TWO
CHAPTER THREE 3.5 HOW TO CONNECT ENERGY METER WITH ARDUINO3.6 CALCULATION OF PULSES AND UNITS
4.6 BILL OF ENGINEERING MEASUREMENTS AND EVALUATION CHAPTER FIVE
CHAPTER ONE
1.3 AIM AND OBJECTIVES OF THE PROJECT
1.4 SIGNIFICANCE OF THE PROJECT
|
|
1.5 PURPOSE OF THE PROJECT
The main purpose of this work is to provide a simple, low cost and easy means of recharging, monitoring or reading our energy consumed in our homes, offices or industries.
1.6 BENEFITS OF THE PROJECT
There are many benefits of this project:
- Pay according to your current income situation.
- Reduce electricity consuming when income is tight.
- No billing errors.
- No debt money.
- No need of extra staff for meter reading.
- Customer will be responsible for disconnections.
1.7 APPLICATION OF THE PROJECT
This device can be used in places, such as:
- Homes
- Offices
- Workshops
- Industries
- Worshiping centres, etc.
1.8 PROJECT ORGANISATION
The work is organized as follows: chapter one discuses the introductory part of the work, chapter two presents the literature review of the study, chapter three describes the methods applied, chapter four discusses the results of the work, chapter five summarizes the research outcomes and the recommendations.
CHAPTER FIVE
5.1 CONCLUSION
The advancement in power distribution system is non-stop process and new technology is always in progress. In this paper, an Arduino and a GSM based smart prepaid energy meter has been proposed. Units are purchased by using GSM technology and those units are deduced according to electricity usage. This project presents a single-phase energy meter for domestic consumers with prepayment billing method. The significant preferred standpoint is the capacity of this system to update the current conventional meters into smart prepaid meters with a connection of Arduino and GSM (Prepaid Module). This kills the need of totally supplant the energy meters. Cost is the main important factor of this work which is quite high but will reduce from 3 to 4 times after implementation of this project. Nowadays as power supply companies need labour for meter reading after implementing this, there will be no need of so many meter readers and lots of money will be saved. The idea of prepayment electricity bill prior its usage is being gradually accepted around the world, and that’s why the market for prepaid energy metering is growing. After having many advantages, this project still needs more safety check and modification especially the GSM module for the network coverage of SIM which is being used, should be strong so that the GSM can work properly.
At the end of this work, a GSM based energy prepaid meter was built. The system was tested and functions were responding to its operation, which means that the objective of this work was achieved.
5.2 RECOMMENDATION
For safety purposes and to ensure the integrity of your Electrical Compliance it is recommended that installation is performed by a Certified Electrician.
DO NOT try to install yourself if you are NOT a Certified Electrician. If you damage the meter you will NOT get a refund and if you get hurt in any way, we hold no liability or responsibility for your actions.
Fig. 4.1: Picture Of the layout of the work After Soldering.
CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of "design and construction of energy based prepaid meter" is also available. Order full work to download. Chapter two of "design and construction of energy based prepaid meter" consists of the literature review. In this chapter all the related works on "design and construction of energy based prepaid meter" were reviewed.
CHAPTER THREE: The complete chapter three of "design and construction of energy based prepaid meter" is available. Order full work to download. Chapter three of "design and construction of energy based prepaid meter" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.
CHAPTER FOUR: The complete chapter four of "design and construction of energy based prepaid meter" is available. Order full work to download. Chapter four of "design and construction of energy based prepaid meter" consists of all the test conducted during the work and the result gotten after the whole work
CHAPTER FIVE: The complete chapter five of "design and construction of energy based prepaid meter" is available. Order full work to download. Chapter five of "design and construction of energy based prepaid meter" consist of conclusion, recommendation and references.
To "DOWNLOAD" the complete material on this particular topic above click "HERE"
Do you want our Bank Accounts? please click HERE
To view other related topics click HERE
To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE
Do you want us to research your new topic? if yes, click "HERE"
Do you have any question concerning our post/services? click HERE for answers to your questions
For more information contact us through any of the following means:
Mobile No :+2348146561114 or +2347015391124 [Mr. Innocent]
Email address :engr4project@gmail.com
COUNTRIES THAT FOUND OUR SERVICES USEFUL
Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124
Watsapp No
:+2348146561114
Email Address
:engr4project@gmail.com
FOLLOW / VISIT US VIA: