USER'S INSTRUCTIONS: The project work you are about to view is on "design and construction of energy prepaid meter, activation and deactivation". Please, sit back and study the below research material carefully. This project topic ( design and construction of energy prepaid meter, activation and deactivation) have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "design and construction of energy prepaid meter, activation and deactivation" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "design and construction of energy prepaid meter, activation and deactivation" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.
TITLE PAGE
DESIGN AND CONSTRUCTION OF ENERGY PREPAID METER, ACTIVATION AND DEACTIVATION
BY
---
--/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---
DECEMBER,2018
APPROVAL PAGE
This is to certify that the research work, " design and construction of energy prepaid meter, activation and deactivation" by ---, Reg. No. --/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.
By
--- . ---
Supervisor Head of Department.
Signature………………. Signature……………….
……………………………….
---
External Invigilator
DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.
ACKNOWLEDGEMENT
The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.
PROJECT DESCRIPTION: This work "
design and construction of energy prepaid meter, activation and deactivation" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "
design and construction of energy prepaid meter, activation and deactivation" visible for everyone, then the complete material on "
design and construction of energy prepaid meter, activation and deactivation" is to be ordered for. Happy viewing!!!
This project aims at to introduce new idea on energy management and control, minimization of power loss and theft due to illegal activities. This framework embraces the same strategy known as “energy prepaid meter”. The GSM module is utilized so that the client can persistently be notified of the monitoring and control by the providers of the energy utilization and can be able to recharge via sms, if attempt bypass, the system disconnected, only providers can reconnect remotely via sms, it alerts the client the energization. The fundamental point of this task is to lessen the long queues at power management, monitor user bypass and charging counters and to disconnect the power naturally if the bill is not paid. The mechanized power charging framework stays informed regarding the continuous utilization and leaves little degree for contradiction on charging and utilization.
TABLE OF CONTENTS
COVER PAGE
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRACT
CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND OF THE PROJECT
- PROBLEM STATEMENT
- AIM AND OBJECTIVE OF THE PROJECT
- SCOPE OF THE PROJECT
- SIGNIFICANCE OF THE PROJECT
- ORGANIZATION OF THE WORK
CHAPTER TWO
LITERATURE REVIEW
- REVIEW OF THE STUDY
- Electricity Theft Mechanisms
- Causes of Electricity Theft
- Existing Ways of Tackling Electricity Theft
- Electricity Theft Identification in Distribution System
- Review of Related Works
CHAPTER THREE
3.0 METHODOLOGY
3.1 SYSTEM BLOCK
3.2 BLOCK DESCRIPTION
3.3 SYSTEM FLOW CHART
3.3 CIRCUIT DIAGRAM
3.4 LIST OF COMPONENTS USED
3.5 PROGRAMING EXPLANATION
3.6 POWER SUPPLY UNIT
CHAPTER FOUR
4.0 RESULTS AND ANALYSIS
CHAPTER FIVE
- CONCLUSION
REFERENCES
CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND OF THE STUDY
Wireless communication has announced its arrival on big stage and the world is going mobile. We want to control everything and without moving an inch. This remote control of appliances is possible through Embedded Systems. The use of “Embedded System in Communication” has given rise to many interesting applications that ensures comfort and safety to human life.
Energy is the very important one in our lives today. We need energy to do anything in this world. The demand of power is growing at a faster rate than the transmission capacity due to the increase in population growth. To overcome the shortage of power supply, this project provides a solution for managing distribution of power to the consumers by using remote monitoring and control to avoid the power theft and bypass problem. The energy prepaid meter provides details of energy consumption which includes, load, kw, unit displays. At the energy provider side, they have the control to monitor bypass, disconnect, and reconnect remotely via sms.
The setup of Smart Energy meter utilizing GSM advancement makes the clients to pay for the energy via sms. A game plan is moreover made to close the client with the aid of GSM correspondence module when their credit in their offset goes low. This system has been proposed as an imaginative response for the issue of sensibility in utilities structure. Since a microcontroller based structure is being made, the readings can be automatically monitor and charges. This diminishes human work and meanwhile constructs the viability in calculation of bills for used energy. Brilliant energy meters will bring an answer of making mindfulness on wastage of energy and will tend to decrease wastage of power.
1.2 Problem Statement
i. To reduce human error or high assumption done while taking the reading by human.
ii. To reduce manpower going house by house taking reading every end of the month.
iii. Time and labour consuming of energy provider companies
All these problem is solved using this project research work, the system design to be a solution to many issue in the energy meter management both for the customer and the energy distributors.
1.3 Aim and Objectives
The aim of the project is to design and construct an intelligent prepaid energy meter that will be able to dictate any bypass by energy theft as well as to recharge the meter through GSM technology.
The objectives include:
i. To design a Prepaid Energy Meter System to control the amount of energy supply based only on the prepaid amount.
ii. To designed a system that will do proper interfacing before microcontroller and the GSM modem.
iii. Write a programme that can accurately monitor sms command.
1.4 Scope of the Study
In order to solve the problems stated, there have two levels required to develop the Prepaid Energy Meter System. The levels mentioned are:
i. The designed and development of the system will be microcontroller based using Atmel and GSM module.
ii. The system will be capable of generating accurate meter reading, calculating the total balance after toping up-unite, send a remind SMS when unit its low and cut-off the supply when the meter.
1.5 Significance of Study
The Global system for mobile communication (GSM based prepaid energy meter is very easy to use). This system includes a mobile set or mobile modem and a recharge number as subscriber identity module (SIM). The customer will send the recharge number to his energy meter in the form of message. The meter will read the message and will recharge (update) itself for the told duration. The meter will pass on the energy as told it in the message in form of coast. In this system the meter will be digitalized and will configure all the functions in the digitalized form. When customer temper the system will automatically disconnect the customer and can only be reconnected via sms from the providers. The project categorized into three part, the first part of this project is the hardware design or electronic using processor chip (microcontroller) and the second part is the C programming for the firmware design and implementation. Each of the part will be designed and test separately to ensure is fully working.
The hardware comprised of the circuitry and the interfacing with processor chip, while the software comprised of the programming aspect for the firmware. Finally, the integration of the parts to complete the project, the figure 1 shows a typical block diagram used in this project work.
1.6 Organization of the Work
CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of " design and construction of energy prepaid meter, activation and deactivation" is also available. Order full work to download. Chapter two of " design and construction of energy prepaid meter, activation and deactivation" consists of the literature review. In this chapter all the related work on " design and construction of energy prepaid meter, activation and deactivation" was reviewed.
CHAPTER THREE: The complete chapter three of " design and construction of energy prepaid meter, activation and deactivation" is available. Order full work to download. Chapter three of " design and construction of energy prepaid meter, activation and deactivation" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.
CHAPTER FOUR: The complete chapter four of " design and construction of energy prepaid meter, activation and deactivation" is available. Order full work to download. Chapter four of " design and construction of energy prepaid meter, activation and deactivation" consists of all the test conducted during the work and the result gotten after the whole work
CHAPTER FIVE: The complete chapter five of design and construction of a " design and construction of energy prepaid meter, activation and deactivation" is available. Order full work to download. Chapter five of " design and construction of energy prepaid meter, activation and deactivation" consist of conclusion, recommendation and references.
To "DOWNLOAD" the complete material on this particular topic above click "HERE"
Do you want our Bank Accounts? please click HERE
To view other related topics click HERE
To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE
Do you want us to research your new topic? if yes, click "HERE"
Do you have any question concerning our post/services? click HERE for answers to your questions
For more information contact us through any of the following means:
Mobile No :+2348146561114 or +2347015391124 [Mr. Innocent]
Email address :engr4project@gmail.com
COUNTRIES THAT FOUND OUR SERVICES USEFUL
Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124
Watsapp No :+2348146561114
Email Address :engr4project@gmail.com
FOLLOW / VISIT US VIA: