DESIGN OF HYDRAULIC SYSTEM OF A CUTTER HEAD PIPELINE DREDGER
USER'S INSTRUCTIONS: The project work you are about to view is on "design of hydraulic system of a cutter head pipeline dredger". Please, sit back and study the below research material carefully. This project topic "design of hydraulic system of a cutter head pipeline dredger" have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "design of hydraulic system of a cutter head pipeline dredger" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "design of hydraulic system of a cutter head pipeline dredger" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.
TITLE PAGE
BY
---
--/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---
APPROVAL PAGE
This is to certify that the research work, "design of hydraulic system of a cutter head pipeline dredger" by ---, Reg. No. --/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.
By
--- . ---
Supervisor Head of Department.
Signature………………. Signature……………….
……………………………….
---
External Invigilator
DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.
ACKNOWLEDGEMENT
The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.
PROJECT DESCRIPTION: This work "design of hydraulic system of a cutter head pipeline dredger" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "design of hydraulic system of a cutter head pipeline dredger" visible for everyone, then the complete material on "design of hydraulic system of a cutter head pipeline dredger" is to be ordered for. Happy viewing!!!
This paper describes the design of hydraulic system of a cutter head pipeline dredger. Hydraulic dredging uses centrifugal pumps to transport dredged material a long a pipeline. A cutter head for a cutter suction dredger to be mounted rotably about a cutter head center axis with respect to a suction device for sucking up material cut loose by the cutter head from the bottom of a body of water, which cutter head includes a base ring, a boss spaced from the base ring in the direction of the center axis, and a number of arms which extend from the base ring to the boss and are distributed at regular intervals in the peripheral direction, each arm has a series of teeth located on the radially outermost parts of the arm and directed outwards at an angle with respect to the peripheral direction, the direction of rotation of the cutter head being set such that the teeth perform a cutting movement, with non-return mechanisms, preventing movement of cut material from the center axis to the exterior.
Key words: Dredging, pipeline, cutter suction dredge, hydraulic system, ladder pump.
TABLE OF CONTENTS
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWLEDGEMENT
ABSTRACT
TABLE OF CONTENT
CHAPTER ONE
- INTRODUCTION
- BACKGROUND OF THE PROJECT
- PROBLEM STATEMENT
- AIM/OBJECTIVE OF THE PROJECT
- SCOPE OF THE PROJECT
- APPLICATION OF DREDGE CUTTER HEAD
- ADVANTAGES of CUTTER HEAD DREDGERS
- LIMITATIONS of CUTTER HEAD DREDGERS
CHAPTER TWO
LITERATURE REVIEW
2.1 REVIEW OF RELATED STUDIES
2.2 TYPES OF HYDRAULIC DREDGERS
2.3 MAJOR DREDGING EQUIPMENT AND OPERATIONS
2.4 RESEARCH GAPS AND FUTURE RESEARCH
CHAPTER THREE
3.0 METHODOLOGY
3.1 DESIGN MODEL
3.2 SYSTEM DESIGN
CHAPTER FOUR
4.1 RESULTS AND DISCUSSIONS
CHAPTER FIVE
- CONCLUSIONS
REFERENCES
CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND OF THE STUDY
The development of the dredging industry, the increase in population, and larger draft vessels contribute to a rise in the demand of dredging for various purposes. Dredges build and maintain artificial islands, harbors, and channels (MacLeod and Butler 2019). Dredging increases the water depth of ship entrance channels in order to prevent a vessel from encountering the channel bottom. A dredge is also used for mining to obtain essential industrial materials such as gold, tin, rutile, etc. (Hennart 2016).
The cutter head dredge is one type of hydraulic dredge that is widely used in dredging navigable waterways (Randall et al. 2018). Because the cutter head dredge can perform both excavation and transportation, its efficiency is higher than other types of dredges (Tang et al. 2019). The cutter head dredge uses a rotating cutter in front of the suction inlet to excavate bottom materials. The excavated material enters the pipe inlet on the suction side of a centrifugal pump and is transported to a barge or a placement site through a pipeline (Paulin et al. 2013). The maximum operating water depth for the cutter suction dredge without a ladder pump or submerged pump is approximately 30-35 m (Jukes et al. 2011; Pauline et al. 2014), but deeper operating depths are possible by adding a ladder pump.
It is important to estimate production of the dredged material (Miedema 2018). For the cutter suction dredge, production is a function of the operating flow rate, the solids concentration by volume, and the dredging efficiency. In addition, the operating flow rate is highly related to the critical flow rate, the net positive suction head (NPSH), and pump characteristics. Turner (2016) estimates production for hydraulic dredges based on these parameters. In order to prevent pump cavitation and overcome the power limitation of any individual pump, the main pump, ladder pump, and booster pumps must be located properly.
Dredge cutterheads are generally hemispherical with a multiplicity of hard rock cutting teeth or replaceable edges projecting outwardly from helical support arms or blades disposed about the hemispherical surface of the cutterhead. The cutterhead has a hub which fits around a shaft that provides the torque for turning the cutterhead in its operation of dredging. The cutterhead encounters all kinds of materials, including rock, sand and clay which must be removed from the bed being dredged.
The design of hydraulic system of a cutter head pipeline dredger is described in this work.
1.2 PROBLEM STATEMENT
Conventional cutterhead arms are shaped to minimize wear, but are not designed to move material. However, one of the problems encountered by cutterheads is that the material loosened by the cutting teeth must be directed into a suction pipe in order to be removed from the bottom of the waterway. As the cutterhead moves across the waterway bottom, the cutting teeth dig below the bed to loosen material. Unfortunately, a substantial portion of the material loosened by the cutting teeth does not reach the suction mouth, which is generally located adjacent to the lower side of the ring of the cutterhead. The hydraulic system of this machine make it possible for the machine to overcome these challenges/limitations.
1.3 AIM AND OBJECTIVES OF THE STUDY
The main aim of this work is to design a hydraulic system of a cutter head pipeline dredger. The objectives are:
- To build a cutter suction dredger provided with a suction device having a cutter head.
- To produce a sucking action in the suction device in order to create a flow of water and cut ground material from the interior of the suction head and via the openings between the arms of the suction head,
1.4 SCOPE OF THE STUDY
The scope of this work covers designing a cutter head for a cutter suction dredger which intended to be mounted rotatably about a cutter head center axis with respect to a suction device for sucking up material which has been cut loose by the cutter head from the bottom of a body of water, which cutter head comprises a base ring, a core located at a distance from the base ring in the direction of the center axis, as well as a plurality of arms which extend from the base ring to the core, each of which arms has a series of teeth located on the radially outermost parts of the arm and directed outwards at an angle with respect to the peripheral direction, the direction of rotation of the cutter head being set in such a manner that the teeth perform a cutting movement.
A cutter head of this type is known, and is used in those circumstances in which material can be cut from the bottom of a body of water. For this purpose, the cutter head is provided with cutting teeth, which are attached to the cutter head by means of a replaceable holder system. Depending on the ground material which is being processed, the teeth are subject to considerable wear. After some time, the teeth are consequently no longer suitable for cutting ground material, so that they have to be replaced.
1.5 APPLICATION OF DREDGE CUTTER HEAD
Dredge cutter head used to remove material from harbors, shipping channels, and other marine environments and mining operations. They are also used for larger dredging projects such as navigation channels and port development and maintenance and land reclamation and in major projects.
1.6 ADVANTAGES of CUTTER HEAD DREDGERS
The most powerful cutters can dredge hard rock effectively on a continuous basis. The self-propelled CSDs can travel long distances and be deployed in remote locations, far from their home port, making them flexible to be used all over the world. They can work in shallow waters and they also have flexible discharge alternatives.
Small and medium size cutter head dredgers can be dismountable and transportable over land. The hull is then comprised of a series of pontoons, with the one pontoon containing the machinery.
1.8 LIMITATIONS of CUTTER HEAD DREDGERS
Cutter suction dredges are sensitive to rough seas and are not easily moved whilst working.
CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of "design of hydraulic system of a cutter head pipeline dredger" is also available. Order full work to download. Chapter two of "design of hydraulic system of a cutter head pipeline dredger" consists of the literature review. In this chapter all the related work on "design of hydraulic system of a cutter head pipeline dredger" was reviewed.
CHAPTER THREE: The complete chapter three of "design of hydraulic system of a cutter head pipeline dredger" is available. Order full work to download. Chapter three of "design of hydraulic system of a cutter head pipeline dredger" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.
CHAPTER FOUR: The complete chapter four of "design of hydraulic system of a cutter head pipeline dredger" is available. Order full work to download. Chapter four of "design of hydraulic system of a cutter head pipeline dredger" consists of all the test conducted during the work and the result gotten after the whole work
CHAPTER FIVE: The complete chapter five of "design of hydraulic system of a cutter head pipeline dredger" is available. Order full work to download. Chapter five of "design of hydraulic system of a cutter head pipeline dredger" consist of conclusion, recommendation and references.
To "DOWNLOAD" the complete material on this particular topic above click "HERE"
Do you want our Bank Accounts? please click HERE
To view other related topics click HERE
To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE
Do you want us to research your new topic? if yes, click "HERE"
Do you have any question concerning our post/services? click HERE for answers to your questions
For more information contact us through any of the following means:
Mobile No :+2348146561114 or +2347015391124 [Mr. Innocent]
Email address :engr4project@gmail.com
COUNTRIES THAT FOUND OUR SERVICES USEFUL
Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc