GENERATION TRANSMISSION CONGESTION FOR IMPROVED STABILITY

USER'S INSTRUCTIONS: The project work you are about to view is on "generation transmission congestion for improved stability" Please, sit back and study the below research material carefully. This project topic "generation transmission congestion for improved stability" have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "generation transmission congestion for improved stability" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "generation transmission congestion for improved stability" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

GENERATION TRANSMISSION CONGESTION FOR IMPROVED STABILITY

BY

---
EE/H2013/01430
DEPARTMENT OF ---
INSTITUTE OF ---

DECEMBER,2018



APPROVAL PAGE

This is to certify that the research work, "generation transmission congestion for improved stabilityNational Diploma on Electrical and Electronics Engineering has been approved.

By
Dr. ---                                           Dr. ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
Dr. ---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work “generation transmission congestion for improved stability” research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of “design of a solar photovoltaic system for two bedroom flat” visible for everyone, then the complete material on “generation transmission congestion for improved stability” is to be ordered for. Happy viewing!!!


ABSTRACT

In the expanding transmission network, Congestion management and voltage stability are significant issues to be handled. Congestion management can be improved by increasing the power transfer capability or by reducing the system losses. With proper VAR support, the issue of voltage instability can be vanquished. Adaption of Flexible AC Transmission System (FACTS) devices is a techno-commercial manner to overcome the above issues. Unified Power Flow Controller (UPFC) is a pliable FACTS device which can control active power, reactive power and voltage injections concurrently in an efficient manner. In this paper power flow model of UPFC is described, location of UPFC is determined by Line Utilization Factor (LUF) and Line Voltage Stability Index (Lmn index) in order to find out the lines which are more vulnerable for congestion and voltage instability. The effectiveness of UPFC is tested on IEEE-14 bus system using MATLAB software. The results are compared with Placement and without placement of FACTS device.

TABLE OF CONTENTS
COVER PAGE
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRACT
GLOSSARY
CHAPTER ONE

    •   INTRODUCTION
    • AIM OF THE STUDY
    • SCOPE OF THE STUDY
    • STATEMENT OF PROBLEM
    • SIGNIFICANCE OF THE STUDY
    • CAUSES OF POWER CONGESTION
    • IMPACTS OF GENERATION AND TRANSMISSION CONGESTION

CHAPTER TWO
LITERATURE REVIEW

    • OVERVIEW OF THE STUDY
    • REVIEW OF THE RELATED STUDIES
    • STUDY OF VARIOUS CASES FOR CONGESTION MANAGEMENT IN DIFFERENT COUNTRIES
    • CONGESTION MANAGEMENT TECHNIQUES

CHAPTER THREE
3.0     METHODOLOGY
3.1     PLACEMENT OF UPFC
3.2      POWER FLOW MODEL OF UPFC
CHAPTER FOUR

    • RESULTS

CHAPTER FIVE

    • CONCLUSION
    • REFERENCES

GLOSSARY
FACTS = Flexible AC Transmission   Systems
TCSC = Thyristor         Controlled Series  Capacitor
UPFC = Unified    Power    Flow Controller
GA = Genetic Algorithms.
OPF = Optimal Power Flow
CHAPTER ONE
1.1                                              INTRODUCTION
With the significant increase in power demand in the few past decades, the size of the power transmission network have been improved in vertically integrated environment as well as deregulated power sector. However, the Congestion management and voltage instability problems are challenging issues for the secured and reliable operation of power system.
Congestion in transmission refers to inability of transmission line to deliver power to  the desired customer due to simultaneous transactions or insufficient transmission capacity of transmission line [1]. In deregulated power market congestion management is very complex task for system operator when compared to regulated system [2]. The literatures [3-4] have explained different methods and techniques of congestion management. Different problems due to congestion and congestion management by FACTS devices are explained in [5].
We have variant definitions for Voltage stability in literature, as per IEEE/CIGRE voltage stability is defined as ability of a system to take care of voltage in order that once load admittance is raised, load power can increase and that each power and voltage square measure manageable [6]. Voltage instability problem raises due to heavily loads, inability to meet VAR demand, line outages etc., [7]. Voltage stability analysis, assessment techniques and control methods are explained in references [8-10].
If the transmission system is incapable of handling congestion management and voltage stability it leads to problems of outages, block-outs etc., which dangers the system security and reliability [11]. In order to overcome the above problems FACTS devices are to be allocated in optimal places [12]. M. Esmaili [13] proposed a method for optimal location and sizing of series FACTS device Thyristor Controlled Switched Capacitor (TCSC) based on priority list and Locational Marginal Pricing (LMP).Based on reactive power loss and real power flow performance index TCSC is placed [14]. UPFC have been placed for congestion management based upon Power transmission congestion distribution factor [15], sensitivity analysis and LMP [16]. Voltage stability index also used for congestion management [17] and the voltage stability have been improved by UPFC placement [18]. Based on Newton-Rapshon Optimal Power Flow (NR-OPF) method UPFC have been placed, which enhances the voltage profile and power transfer capability simultaneously[19].
In this paper Line Utilization Factor (LUF) and Line Stability Index (Lmn- index) are used for placement of UPFC. Also Voltage Collapse Proximity Index (VCPI) and Active Power Performance Index (APPI) are calculated before and after placement of UPFC in order to observe the performance of UPFC in congestion management and voltage stability. The performance of FACTS device is tested on IEEE-14 bus system for different loading conditions.


1.2                                         AIM OF THE PROJECT
Power generation and Transmission congestion is a vital problem in the power system security and reliability sector. To ensure the stable operation of the system, a congestion free power network is desirable. The aim of this work is to discuss and apply techniques used in clearing congestion in power system.


1.3                                      SCOPE OF THE STUDY
In this paper, a new Congestion Management (CM) technique, the FACTS devices are  a handy FACTS device named Unified Power Flow Conditioner (UPFC) is used. We have placed the UPFC based upon line burden and voltage stability indices namely Line Utilization Factor (LUF) and Lmn-index. The impact of UPFC in congestion relief and Voltage stability improvement are assayed through Active Power Performance Index (APPI) and Voltage Collapse Proximity Indicator (VCPI).


1.4                                    STATEMENT OF PROBLEM
The occurrence of congestion in power systems leads to system disturbances that cause further outages in an interconnected system. Congestion is also caused by grave damage to power system components if system outages frequently occur. It is not only equipment which is harmed by congestion, but also the power quality [8]. To prevent power system equipment from being damaged and to enhance power quality, congestion systems need to function immediately.


1.5                                 SIGNIFICANCE OF THE STUDY
The importance of congestion management is discussed in reference [6], which identify the congestion management as one the key issues to maintain security and reliability of transmission networks. Congestion management balances the system and solves financial issues arising from the congestion. Lack of attention to congestion in the system may lead to widespread blackouts associated with negative social and economic consequences.


1.6                              CAUSES OF POWER CONGESTION
In deregulated environment, the term Transmission Open-Access (TOA) indicates that the transmission network is freely available to the other market participants such as generators, customers, or other utilities that want to use the transmission network for power transaction between them and thus creates a situation in which transmission network is not able to accommodate all the desired transaction due to violations of some system constraint, this is known as congestion. The congestion may be caused due to various reasons, such as:

  • transmission line outages
  • generator outages and
  • change in energy demand.

Other reasons, due to which congestion problem has increased in recent years, are as follows:-
1. Deregulation of power industry has caused the electricity price to be lower, better service quality and electricity in bulk can be sent across-border in competitive electricity markets. Such transmission of bulk power may cause the electricity networks to reach their physical limits.
2. In deregulated environments, if transmission capacity is not enough then there is a lack of investment in electricity networks in order to meet the demand and generation. Or, it can be said that transmission capacity relative to peak load, has become less in many countries.
3. Due to the integration of wind generation into electricity transmission networks, it is difficult to manage congestion because of fast changing power flows of electricity networks caused by wind power fluctuations.


1.7       IMPACTS OF GENERATION AND TRANSMISSION CONGESTION
In the deregulated power industry, generation and transmission congestion is a major problem for the electricity markets. The congestion has a wide range of impacts on the entire electricity market as well as the individual market players i.e. sellers and buyers.
Without congestion lowest-priced resources are used to meet the demand but if the congestion is present in the transmission network then it prevents the demand to be met by the lowest-priced resources due to transmission constraints and some energy is purchased from alternative sources at higher prices. But if this price exceeded than the willingness to pay of the buyers, then some of the demand is not fulfilled in the particular market. This condition occurs especially in area where demand exceeds the local generation. This demand can be met by the imports of electricity from other areas. The suppliers at the import side may raise their prices as high as they want and results in an increase in Locational Marginal Prices & creates market power.
The LMP at a location is the marginal cost of supplying the next MW of load to the location using the lowest production cost of all available generation without violating any system security limit. Market power is defined as the conditions where a market participant can profitably maintain prices above a competitive level for a significant period of time. Market power results a decrease in competition and exercising market power can raise price and lower market efficiency. There are two sources for the occurrence of market power i.e. market dominance and congestion. In the electricity market, a supplier can exercise market power by either physical withholding or economical withholding.
As the presence of congestion on the grid prevents the use of the lowest-priced resources to met the load, therefore change of the generation/demand schedule is required that will result in higher cost than that for the unconstrained market and hence a loss in the market efficiency occurs due to the change in the generation/demand schedule.

  • Congestion Impact On Market Efficiency

To show the impact of congestion on market efficiency a two zone system connected by an interface is considered. Let each zone have a 100 MW constant load. Zone A has a 200 MW generator with an incremental cost of $10/MWh and Zone B has a 200 MW generator with an incremental cost of $20/MWh.
Without any transfer limit between zones (without congestion), all 200 MW of load will be bought from generator A at $10/MWh, and the cost will be $2000/h, as shown in Fig. 1(a). If there is a 50Mw transfer limit, then 150 MW will be bought from A at $10/MWh and the remaining 50 MW must be bought from generator B at $20/MWh, at a total cost of $2500/h. Thus Congestion has created a market inefficiency of 25% of the optimal costs.

Congestion has also created unlimited market power for generator B. Generator B can increase its bid as much as it wants, because the loads must still buy 50 MW from it.

  • Congestion Impact on Market Players

Congestion affects virtually each market players either in a positive or in a negative way.
At the import side buyer may suffer a decrease in consumer surplus because due to transmission constraints it has limited access of energy from other resources, therefore he has to buy energy from the higher-price seller located at the import side. This lack of choice causes either the higher payment prices or reduced purchases of energy. Therefore, the buyer’s consumer surplus decreases. However, a seller located at the import side may offer his output at higher prices, and if the demand is fixed and buyer can afford the price them seller may sell more energy, resulting in an increased producer surplus.
Conversely, a buyer at the export side will have an increase in his consumer surplus because it may increase its energy purchases if the buyer’s willingness to pay is high. However, a seller located at the export side may suffer a decrease in his producer surplus.

CHAPTER TWO: The complete chapter two of “generation transmission congestion for improved stability” is available. Order full work to download. Chapter two of “generation transmission congestion for improved stability” consists of the literature review. In this chapter all the related work on “generation transmission congestion for improved stability” was reviewed.

CHAPTER THREE: The complete chapter three of “generation transmission congestion for improved stability” is available. Order full work to download. Chapter three of “generation transmission congestion for improved stability” consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of “generation transmission congestion for improved stability” is available. Order full work to download. Chapter four of “generation transmission congestion for improved stability” consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of design and construction of a “generation transmission congestion for improved stability” is available. Order full work to download. Chapter five of “generation transmission congestion for improved stability” consist of conclusion, recommendation and references.



To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions

You can also visit our facebook Page at fb.me/hyclas to view our related construction (or design) picture.


For more information contact us through Any of the following means:

Mobile No :+2348146561114 or +2347015391124 [Mr. Innocent]

Email address :engr4project@gmail.com

Watsapp No :+2348146561114

To View Our Design Pix: You can also visit our facebook Page at fb.me/hyclas for our design photos/pics.


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124
Watsapp No
:+2348146561114

E
mail Address :engr4project@gmail.com