phonelogo+234 8146561114 or +2347015391124

USER'S INSTRUCTIONS: The project work you are about to view is on "installation of overhead lines". Please, sit back and study the below research material carefully. This project topic "installation of overhead lines" have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "installation of overhead lines" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "installation of overhead lines" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

 

BY

---
--/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---



APPROVAL PAGE

This is to certify that the research work, "installation of overhead lines" by ---, Reg. No. --/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.

By
---                                                     . ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work "installation of overhead lines" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "installation of overhead lines" visible for everyone, then the complete material on "installation of overhead lines" is to be ordered for. Happy viewing!!!


ABSTRACT

An overhead power line is an electric power transmission line suspended by towers or poles. The purpose of this work is to outline the various requirements for, and the procedures one have followed in the design of overhead transmission lines. Numerous design studies, which have been made on specific aspects of transmission line design, are included with explanations of their applications. Information is presented concerning such aspects as selection of type of construction, conductor sags and tensions, insulation, lightning protection, clearance patterns, galloping conductors, structure limitation and guying charts, and structure spotting. Structure design examples are limited to wood-pole construction.  

TABLE OF CONTENTS
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWLEDGEMENT
ABSTRACT
TABLE OF CONTENT

CHAPTER ONE
 INTRODUCTION
1.1       BACKGROUND OF THE PROJECT
1.2      PROBLEM STATEMENT
1.3      AIM AND OBJECTIVE OF THE PROJECT
1.4      SCOPE OF THE PROJECT 
1.5      SIGNIFICANCE OF THE PROJECT

CHAPTER TWO
2.0 LITERATURE REVIEW
2.1     OVERVIEW OF OVERHEAD POWER LINE
2.2    CLASSIFICATION OF TRANSMISSION LINES
2.3    HISTORICAL BACKGROUND OF THE STUDY
2.4      TYPES OF CONDUCTORS USED IN OVERHEAD POWER LINES.

CHAPTER THREE

3.0      METHODOLOGY
3.1      OVERHEAD TRANSMISSION LINES COMPONENTS
3.2      DESCRITION OF OVERHEAD ACCESSORIES
3.3      OVERHEAD TRANSMISSION LINE INSTALLATION PROCEDURE

CHAPTER FOUR

4.1      TYPES OF OVERHEAD TRANSMISSION LINE SUPPORTS
4.2      GENERAL CONSIDERATIONS FOR OVERHEAD LINE SUPPORT DESIGN
4.3      OVERHEAD LINES SAFETY MEASURES
CHAPTER FIVE
5.1      CONCLUSION
5.2       REFERENCES

 

CHAPTER ONE
1.0                                                             INTRODUCTION
1.1                                                BACKGROUND OF THE STUDY
The electrical power system comprises of three main subsystems: generation, transmission, and distribution. The transmission system is responsible for connecting the generation side to the consumption or distribution side.
Most of the power transmission systems are operating in Alternating Current (AC) with several high voltage levels that increases with the increase of the line length to reduce the transmission losses.
AC power transmission lines might be designed to be Overhead Transmission Lines (OHTL) or Underground Transmission Cables (UGTC). The majority of AC transmission lines are overhead transmission lines and the main reason is that the cost of underground cable system is considerably more compared to overhead lines. In general, OHTL are generally used for power transmission at long distances in open county and rural areas in addition to that, OHTL are generally with longer lifespan, easier to install and repair and require lower manufacturing & construction costs in comparison to UGTC. The main aim of this work is to study the installation process of overhead transmission line.

1.2                                                       PROBLEM STATEMENT
The Occupational Safety and Health Administration (OSHA), “…has estimated that an average of 12,976 lost-workday injuries to and 86 fatalities of electric power generation, transmission, and distribution employees occur annually. Using these figures, OSHA has also estimated the number of injuries which could be prevented by the new regulations. Taking into account such factors as existing regulation and the differences in training levels among utilities, OSHA estimated that 1,634 lost-workday injuries and 61 deaths could be prevented each year” (OSHA, 2019). This work was carried out to highlight the right procedure on how to work and safely installed overhead lines thereby increasing safety measures.

1.3                                          AIM AND OBJECTIVE OF THE STUDY
The purpose of this work is to outline the various requirements for, and the procedures to be followed in the design of an overhead transmission lines. The objectives are:

  1. Safely evaluate, manipulate, stabilize, and work around overhead lines
  2. Minimize electrical and physical/rigging hazards when installing and removing overhead lines.
  3. Evaluate, inspect, and safely install an overhead lines

1.4                                                        SCOPE OF THE STUDY
The scope of this work covers the engineering tools and concepts that have proven to be successful over many years of transmission line design which have been made on specific aspects of transmission line design, are included with explanations of their applications.

1.5                                                SIGNIFICANCE OF THE STUDY

This work is not just a book, but a useful reference and guide for electrical designers. Information is presented concerning such aspects as selection of type of construction, conductor sags and tensions, insulation, lightning protection, clearance patterns, galloping conductors, structure limitation and guying charts, and structure spotting. Structure design examples are limited to wood-pole construction. Interpretations of the National Electrical Safety Code and other codes are made as required.

CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of "installation of overhead lines" is also available. Order full work to download. Chapter two of "installation of overhead lines" consists of the literature review. In this chapter all the related work on "installation of overhead lines" was reviewed.

CHAPTER THREE: The complete chapter three of "installation of overhead lines" is available. Order full work to download. Chapter three of "installation of overhead lines" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of "installation of overhead lines" is available. Order full work to download. Chapter four of "installation of overhead lines" consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of "installation of overhead lines" is available. Order full work to download. Chapter five of "installation of overhead lines" consist of conclusion, recommendation and references.

 

CLICK HERE FOR MORE RELATED TOPICS/MATERIAL


To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions


For more information contact us through any of the following means:

Mobile No phonelogo:+2348146561114 or +2347015391124 [Mr. Innocent]

Email address emailus:engr4project@gmail.com

Watsapp No whatsapp.html :+2348146561114


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124

Watsapp Nowhatsapp.html
:+2348146561114


E
mail Address emailus:engr4project@gmail.com


FOLLOW / VISIT US VIA:

tweeter instagram.htmlfacebook logomyyoutubelogo.html