phonelogo+234 8146561114 or +2347015391124
THE DESIGN AND CONSTRUCTION OF AC (WINDOW UNIT) CONTAINING HEAT PUMP

USER'S INSTRUCTIONS: The project work you are about to view is on "the design and construction of ac (window unit) containing heat pump". Please, sit back and study the below research material carefully. This project topic ( the design and construction of ac (window unit) containing heat pump) have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "the design and construction of ac (window unit) containing heat pump" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "the design and construction of ac (window unit) containing heat pump" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

THE DESIGN AND CONSTRUCTION OF AC (WINDOW UNIT) CONTAINING HEAT PUMP

BY

---
--/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---

DECEMBER,2018



APPROVAL PAGE

This is to certify that the research work, " the design and construction of ac (window unit) containing heat pump" by ---, Reg. No. --/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.

By
---                                                     . ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work " the design and construction of ac (window unit) containing heat pump" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of " the design and construction of ac (window unit) containing heat pump" visible for everyone, then the complete material on " the design and construction of ac (window unit) containing heat pump" is to be ordered for. Happy viewing!!!


ABSTRACT

This project study is applicable to the field of heating and air conditioning. The design and construction of a window unit air conditioner with heat pump was carried out to achieve a suitable comfort in our home and office environment. After a study of existing air-conditioners and survey for availability of materials, the design concept of the window unit air-conditioner was achieved. And the following standard part were estimated as; compressor power rating 2.5hp, condenser power 8KW, evaporator power 5.85KW,  power rating of blower as 120watts and heat pump of 100W. And with a working fluid of refrigerant R410A which is weak compared to refrigerant R22 but less hazardous to the environment. The window unit air conditioner was tested for conformance to specification and it was satisfactory.

TABLE OF CONTENTS
COVER PAGE
TITLE PAGE
APPROVAL PAGE
DEDICATION
ACKNOWELDGEMENT
ABSTRACT
CHAPTER ONE

    1. INTRODUCTION
    2. BACKGROUND OF THE PROJECT
    3. AIM OF THE PROJECT
    4. OBJECTIVE OF THE PROJECT
    5. PURPOSE OF THE PROJECT
    6. SIGNIFICANCE OF THE PROJECT
    7. APPLICATION OF THE PROJECT
    8. PURPOSE OF USING ICS

CHAPTER TWO
LITERATURE REVIEW

    1. OVERVIEW OF THE STUDY
    2. HISTORICAL BACKGROUND OF THE STUDY
    3. OPERATING PRINCIPLES
    4. REVIEW OF EXISTING INSTALLATION TYPES OF AIR CONDITIONER
    5. OVERVIEW OF HEAT PUMP
    6. TYPES OF HEAT PUMP SYSTEMS

CHAPTER THREE
MATERIALS AND METHOD

    1. OPERATING PRICIPLE OF WINDOW AC UNIT
    2. DESIGN SPECIFICATION
    3. DESIGN CONSIDERATION
    4. DESIGN CALCULATION

Calculation of Areas in Building Space

Area of Door

Calculation of Area of Concrete Wall

Estimation of Internal Heat Gain

Estimation of Heat Gain due to Air Inflation

Estimation of Coefficient of Performance of the System (COP)

Calculation for Mass Flow Rate

Calculation for Compressor Power

Calculation of Heat Rejected By Condenser

 Volume of Air Flow

Capacity of the humidity (mass of water) removed per hour

Latent Heat Removed From the Air (LH)

Sensible Heat Removed From the Air (SH)

 Sensible Heat Factor (SHF) Of the System

    1. MATERIAL REQUIREMENTS AND SELECTION
    2. FABRICATION REQUIREMENT
    3. MATERIAL SELECTION
    4. FABRICATION PROCEDURE
    5. HEAT PUMP DESIGN
    6. OPERATION OF HEAT PUMP

CHAPTER FOUR

    1. RESULTS AND DISCUSSION
    2. IC PIN NUMBERING
    3. MOUNTING STYLE

CHAPTER FIVE

    1. CONCLUSION
    2. REOCMMENDATION
    3. REFERENCES

 

CHAPTER ONE
1.0                                                        INTRODUCTION
1.1                                           BACKGROUND OF THE STUDY
Air conditioning is the process of altering the properties of air to favorable conditions, typically with the aim of distributing the conditioned air to an occupied space is to improve comfort whilst heat pump only produces heat which is mostly used during the time of cold. In the most general sense, air conditioning can refer to any form of technology humidification, de-humidification, heating, cooling, cleaning, ventilation, or air movement that modifies the condition of air [1-3]. In general, the air conditioner is a device that lowers the air temperature. The cooling is most done using a simple refrigeration cycle, but sometimes the evaporation is used, commonly for the comfort of cooling in buildings and motor vehicles [4-5]. In construction, a complete system of heating, ventilation and air conditioning is referred to as "HVAC" [6]. Air conditioning can also be provided by the simple process called free cooling which uses pumps to circulate a coolant (typically or a glycol mix) from a cold source, which in turn acts as a heat sink for the energy that is removed from the cooled space [7].
Generally, air conditioner can be classified into [8-9]; window unit air-conditioners, central unit air-conditioner, and split unit air-conditioner. In this air conditioner, all the component, namely; the compressor, condenser, expansion valve evaporator and cooling  coil  are  enclosed  in  a single box. Window unit air conditioners are installed in an open window. The interior air is cooled as a fan blows it over the evaporator. On the exterior the heat drawn from the interior is dissipated into the environment as a second fan blows outside air over the condenser. A large house or building may have several such units, allowing each room to be cooled separately.
The central unit air conditioning unit is for cooling big building houses, offices, entire hotels, cinema hall, and factory etc. If the whole building is to be air condition, HVAC engineers find that putting individual units in each of the room is very expensive initially as well in the long run. The central air conditioning unit is comprises of huge compressor that has the capacity to produce hundreds of tons of air conditioning. The window unit  air conditioning system comprises of thermostat, a fan or blower, tubing filled with refrigerant, a compressor, an evaporator coil and a condenser coil.. The heat pump takes care of the heating of the environment. A window air conditioner is the simplest type of AC unit. It’s a single unit with all of the parts and components contained inside one box or casing. This type of AC is usually mounted or installed in a window and plugs into a traditional electrical outlet. It’s convenient because it can be moved from window to window as needed and operates independently from a home HVAC system. However, considering the fact that Nigeria is located in a tropical region which is characterized by excessive high temperature and highly humid, it became necessary to develop a mechanical system which can help to reduce the hot the ambient temperature within a confined space for human comfort. In this research work, we carried out the design and construction of window air conditioner that contain heat pump.
1.2                                                   AIM OF THE PROJECT
The main aim of this work is to build a window air conditioner with heat pump in mechanical engineering workshop.
1.3                                             OBJECTIVE OF THE PROJECT
The objectives of this work are:

  1. To build an air conditioner with heat pump
  2. To analyze calculations involved during the construction
  3. To study and understand working principle of an air conditioner.
  4. To analyze components of air condition.
  5. To analyze the operation and component of heat pump.

1.4                                              PURPOSE OF THE PROJECT
The purpose of this work is to setup a working and tested okay air conditioner which contain heat pump.
1.5                                         SIGNIFICANCE OF THE PROJECT
As a student of mechanical engineering, this work exposed me to working principle of an air conditioner, construction procedure and troubleshooting guide to help me address the most common problems you may encounter with your air conditioner. With this work I was able to explain how to build an air conditioner and its heat pump.
1.6                          APPLICATIONS OF THE PROJECT
Apart from academic purposes, this study can also be useful to:

  1. Ac producers,
  2. Ac users/ owners
Ac technicians

CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of " the design and construction of ac (window unit) containing heat pump" is also available. Order full work to download. Chapter two of " the design and construction of ac (window unit) containing heat pump" consists of the literature review. In this chapter all the related work on " the design and construction of ac (window unit) containing heat pump" was reviewed.

CHAPTER THREE: The complete chapter three of " the design and construction of ac (window unit) containing heat pump" is available. Order full work to download. Chapter three of " the design and construction of ac (window unit) containing heat pump" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of " the design and construction of ac (window unit) containing heat pump" is available. Order full work to download. Chapter four of " the design and construction of ac (window unit) containing heat pump" consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of design and construction of a " the design and construction of ac (window unit) containing heat pump" is available. Order full work to download. Chapter five of " the design and construction of ac (window unit) containing heat pump" consist of conclusion, recommendation and references.

 

CLICK HERE FOR MORE RELATED TOPICS/MATERIAL


To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions


For more information contact us through any of the following means:

Mobile No phonelogo:+2348146561114 or +2347015391124 [Mr. Innocent]

Email address emailus:engr4project@gmail.com

Watsapp No whatsapp.html :+2348146561114


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124

Watsapp Nowhatsapp.html
:+2348146561114


E
mail Address emailus:engr4project@gmail.com


FOLLOW / VISIT US VIA:

tweeter instagram.htmlfacebook logo