USER'S INSTRUCTIONS: The project work you are about to view is on "route survey of the stretch of road ". Please, sit back and study the below research material carefully. This project topic "route survey of the stretch of road " have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "route survey of the stretch of road " project research material is to reduce the stress of moving from one school library to another all in the name of searching for "route survey of the stretch of road " research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.


TITLE PAGE

ROUTE SURVEY OF THE STRETCH OF ROAD

BY

---
EE/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---

DECEMBER,2018



APPROVAL PAGE

This is to certify that the research work, "route survey of the stretch of road " by ---, Reg. No. EE/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.

By
---                                                     . ---
Supervisor                                                  Head of Department.
Signature……………….                           Signature……………….        

……………………………….
---
External Invigilator



DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.



ACKNOWLEDGEMENT

The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.


PROJECT DESCRIPTION: This work "route survey of the stretch of road " research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "route survey of the stretch of road " visible for everyone, then the complete material on "route survey of the stretch of road " is to be ordered for. Happy viewing!!!


ABSTRACT

The project was focused on the execution of route surveying for the purpose of road reconstruction from Oriawo along Ogbomosho road, Oyo to School of Science, Sabo Oyo Town. Stations were selected along the existing route at regular intervals as in the specifications
Theodolite traverse was run over stations, while levels were observed along the longitudinal and cross-sections of the traverse lines. All data were gathered with effective orientation from the controls, these were used to produce the plans (with appropriate scale) showing horizontal alignment, profile and cross-sections. 

TABLES OF CONTENTS

TITLE PAGE
CERTIFICATE
CERTIFICATION
DEDICATION
ACKNOWLEDGEMENTS
ABSTRACT
LIST OF FIGURE..
LIST OF TABLES

CHAPTER ONE
1.0 INTRODUCTION
1.1 BACKGROUND TO THE STUDY
1.2 STATEMENT OF PROBLEMS
1.3.0 AIM AND OBJECTIVES OF THE STUDY
1.3.1 AIM
1.3.2 OBJECTIVES
1.5 SCOPE OF THE PROJECT
1.6     PERSONNEL
1.7     STUDY AREA

CHAPTER TWO
2.0     LITERATURE REVIEW
RECONNAISSANCE
PRELIMINARY SURVEY
LOCATION SURVEY
OFFICE LOCATION: -

CHAPTER THREE
3.0     METHODOLOGY
3.1     RECONNAISSANCE
3.1.1      OFFICE PLANNING
3.1.2   FIELD RECONNAISSANCE
3.2      DATA ACQUISITION
3.2.1      EQUIPMENT USED
3.2.2    TEST OF INSTRUMENT
3.2.2.2   LEVEL INSTRUMENT TEST (TWO PEG TEST)
3.2.3     CONTROL CHECK
3.2.3.1 SELECTION OF STATIONS
3.2.3.2 MONUMENTATION
3.2.4  FIELD OBSEVATION
3.2.4.1       ANGULAR MEASUREMENT
3.2.4.2 LINEAR MEASUREMENTS
3.2.4.3 LEVELING
3.2.4.5 DETAILING

CHAPTER FOUR
4.0      DATA PROCESSING AND RESULT ANALYSIS
4.1     FIELD BOOKS REDUCTIONS
4.1.1      HORIZONTAL ANGLE REDUCTION
4.1.2      VERTICAL ANGLE REDUCTION
4.1.3      LINEAR MEASUREMENT REDUCTION
4.2.1 FORWARD COMPUTATION
4.2.1.1 BEARING REDUCTION
4.2.1.2 CORRECTION TO BEARING
4.2.1.3 COORDINATES REDUCTION
4.2.1.4 COORDINATES ADJUSTMENTS
4.2.2      BACK COMPUTATION
4.2.3 LEVELING COMPUTATION AND ADJUSTMENTS
4.2.3.1 LEVELING ADJUSTMENT
4.2.4 ACCURACY
4.2.4.1 ANGULAR ACCURACY
4.2.4.2   LEVELING ACCURACY
4.2.4.3 LINEAR ACCURACY
4.3     RESULT ANALYSIS
4.4     EXTRACT OF RESULT
4.6      INFORMATION PRESENTATION (ANALOG AND DIGITAL)
4.6.1      PLAN PRODUCTION
4.6.2      MANUAL PLOTTING
4.6.3      DIGITAL PLOTTING

CHAPTER FIVE
5.0     SUMMARY, RECOMMENDATION AND CONCLUSION
5.1     SUMMARY
5.2     PROBLEMS ENCOUNTERED
5.3     CONCLUSION
5.4     RECOMMENDATIONS
REFERENCES
APPENDICES

LIST OF FIGURE

Figure 1.1: Study Area diagram
Figure 3.1 Recce Diagram
Figure 3.2: Leveling instrument set up mid-way (first set -up)
Figure 3.3: Leveling instrument set up( second set up)
Figure 3.4 Initial control check observations
Figure 3.6 A typical monument used.
Figure 3.7: Longitudinal sections leveling.
Figure 3.8: Cross sectional leveling.
Fig.: 3.9 – Illustration of detailing by tacheometry method

LIST OF TABLES

Table 3.1: Coordinates of existing ground controls used
Table 3.2 Collimation test
Table 3.3: Initial control check observation.
Table 3.4: Back computation of initial control used
Closing control check observation.
Back computation of initial control used
Table 4.1 Sample of Horizontal angle reduction
Table 4.1 Back computation of traverse pegs


CHAPTER ONE

1.0 INTRODUCTION

1.1 BACKGROUND TO THE STUDY

Engineering Surveying is one of the branches of surveying which from the general express for any survey work carried out in connection with construction engineering and building project, it is a large scale topographical map survey which the basis for design of engineering works such as highways, railways, canals, tunnels, dams, pipelines and transmission lines.
In the word of engineering and environmental studies, surveying has been recognized as the inevitable operation been described as be the bedrock of every meaningful development. The greater part of its responsibility is seen from the various types of surveying which are all geared toward promoting route ways, convenience, accessibility and spatial declination of both natural and social environment. In addition, surveying means the activities of planning, designing, constructions, development and rehabilitation of roads, depending on the survey data required by the surveyor.
Route survey which is an aspect of engineering survey may be defined as the survey operation that is done for the establishment of the horizontal and vertical alignment of transportation facilities. It involved: planning, design and setting out of any route such as railways, highways, pipelines and canals etc. as obtained by a surveyor and it also involved the proper assessment of natural and man-made features. 
In addition, this type of survey should be applied when there is need for alignment, expansion, or rehabilitation at any existing route (road) e.g. for traffic purposes. The reason is that route survey provides a plan/map that shows the alignment, details, profile and cross sectional leveling which depicts the nature of the terrain of a given strip of land which serves the purpose of location, design and construction of route networks.
Good road network is one of the basic amenities needed by human being as movement is one of the characteristics of living things. There are needs for people to move from one place to the other and transportation of goods and services. Therefore for any meaningful development in a country, good road is a must.

1.2 SIGNIFICANT OF THE PROJECT

            It was discovered that the route from Oyun to olorun village moro Local government Ilorin, Kwara State, had been badly eroded and full of potholes; also, the road is found to be too narrow and needed to be extended considering the volume of traffic plying the road. Rehabilitation of this road should be carried out in other to increase its carrying capacity thereby increase the physical development and human activities therein. Due to these, certain information about the road must be acquired which calls for route survey so as to get the baseline data necessary for the road design.
The main aim of this project is:
To carry-out Route Survey of Oyun-Oloru road in Moro local government area, Ilorin, Kwara State

1.3.2 OBJECTIVES

In actualization of the said aim of the project, the following objectives
Were followed sequentially:

  • Reconnaissance which include office planning and field reconnaissance.
  • Identification of existing features and adjoining roads.
  • Stability of the ground controls to be use for orientation.
  • Determination of centre line and marking of chainages along the centre line at an interval of 25m.
  • Marking out some selected points for the cross-sectioning at intervals of 3m to the right and left on the profile and also the edges of drainage was marked.
  • Leveling to determine the height of some selected points along the road.
  • Detailing by the use of a total station Mato NTS352R
  • Plan production (graphical representation of the surveyed road way) drawn with appropriate scale.
  • Reports write up.

1.4 PROJECT SPECIFICATIONS

The following are the specification to be ascertained in the project:

  • Traverse must commence on three coordinated (known) controls and closed on another set of three coordinated controls which must be confirmed undisturbed by necessary measurement (control checks).
  • Third order theodolite traverse must be run along the route on all turning points at one zero observation and the angular difference  from both faces should not be more than thirty seconds (30"), the angular misclosure is determined by 30"√n,  

Where ‘n’ is the total number of station observed.

  • Establishing traverse points by using pegs together with nails and bottle corks. 
  • Spirit leveling must commence on a known benchmark and closed back on another known benchmark. Formulae for its misclosure are ±24mm√k, where ‘k’ is the total distance covered in kilometers.
  • Leveling must be observed at every 25m intervals on the centre line and at 5m intervals on both sides of the centre line for the cross sectioning. Edges of drainage at both sides should be heightened.
  • Fixing of relevant features to enhance assessment and necessary composition for good interpretation of plan.
  • Setting out curve by using deflection angle method within third other survey.
  • The accuracy of the project must fall within the order of the project.

1.5 SCOPE OF THE PROJECT

The entire project covered the following:-

  • Reconnaissance (both office planning and field reconnaissance).
  • Data acquisition:

(a) Selection of stations.
(b) Traverse  angular observation and data recording.
(c) Linear measurement with the aid of Mato NTS352R total station.
(d) Spirit leveling of traverse centre line and adjacent sides (longitudinal or    profile and cross sectioning).
(e) Fixing of details by tacheometry method.
(iii)Computations to determine:
(a) Horizontal coordinates (i.e. x and y coordinates)
(b) Vertical coordinates (i.e. z coordinates) by level reduction.
(c) Setting out angles and distance for the curve.

  • Data analysis i.e. comparing result obtained with the required accuracy.
  • Data presentation :

(a) Production of horizontal alignment (i.e. plan showing existing features and the propose route).
(b) Production of longitudinal section plan
(c) Production of cross section plan
(d)Project report writing: - This involves writing of detail report in connection with entire project done in conformity with the outline given by the project supervisor.

1.7       STUDY AREA

The project site is the route from Oyun to olorun village moro Local Government area Ilorin, Kwara State. It cover approximately 3.km extent of land.

1.8                                 PROJECT ORGANISATION

The article is divided into five sections including this introduction. Section 2 is on the literature review and method of data collection are in Section 3. Results of findings are discussed in Section 4. The way forward is and conclusion in Section 5.

CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of "route survey of the stretch of road " is also available. Order full work to download. Chapter two of "route survey of the stretch of road " consists of the literature review. In this chapter all the related work on "route survey of the stretch of road " was reviewed.

CHAPTER THREE: The complete chapter three of "route survey of the stretch of road " is available. Order full work to download. Chapter three of "route survey of the stretch of road" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.

CHAPTER FOUR: The complete chapter four of "route survey of the stretch of road " is available. Order full work to download. Chapter four of "route survey of the stretch of road " consists of all the test conducted during the work and the result gotten after the whole work

CHAPTER FIVE: The complete chapter five of design and construction of a "route survey of the stretch of road " is available. Order full work to download. Chapter five of "route survey of the stretch of road " consist of conclusion, recommendation and references.

 

CLICK HERE FOR MORE RELATED TOPICS/MATERIAL


To "DOWNLOAD" the complete material on this particular topic above click "HERE"

Do you want our Bank Accounts? please click HERE

To view other related topics click HERE

To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE

Do you want us to research your new topic? if yes, click "HERE"

Do you have any question concerning our post/services? click HERE for answers to your questions


For more information contact us through any of the following means:

Mobile No phonelogo:+2348146561114 or +2347015391124 [Mr. Innocent]

Email address emailus:engr4project@gmail.com

Watsapp No whatsapp.html :+2348146561114


COUNTRIES THAT FOUND OUR SERVICES USEFUL

Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124

Watsapp Nowhatsapp.html
:+2348146561114


E
mail Address emailus:engr4project@gmail.com


FOLLOW / VISIT US VIA:

tweeter instagram.html pinterestusfacebook logo

Order Full Material(s)
Download Full Material(s)
Bank Accounts

Contact us

Hire a writer

Order/learn construction


View other related topics

Vrequently asked questions(FAQ)
View more related topics and download more material
Format = microsoft word

Chapters = 1-5 chapters


Price: N3,000.
»Accountancy (AC) project
» Agric engineering project topics
» Business admin and management project
» Banking and finance project
» Civil engineering project
» Co-operative economics and management project
» Computer science project
» Community Health Project
» Electrical/electronic/telecom/ power project
» Estate management project
» Education
» Human Kinetics & Health Education Project
» Industrial safety and environmental (ISET) project
» Mass communication project
» Mechanical engineering (ME) project
» Medical And Health Science Project
» Office technology and management (O.T.M) project
» Public administration (PA) project
» Public Health Education Project Topics
» Paramedic Project Topics
» Industrial Physics/Physics Electronics Project
» Science laboratory technology (microbiology option) project
» Agricultural science and engineering seminar
» Building engineering seminar topics/materials
» Civil engineering seminar topics
» Computer science seminar topics
» Environmental seminar topics
» Electrical/electronic/telecom/ power seminar
» Mechanical engineering seminar
» Physics / industrial physics/physics electronics seminar topics/materials