SUITABILITY OF AVAILABLE LATERITE MATERIAL IN ILORIN EAST LOCAL GOVERNMENT AREA FOR ROAD CONSTRUCTION
USER'S INSTRUCTIONS: The project work you are about to view is on "suitability of available laterite material in ilorin east local government area for road construction". Please, sit back and study the below research material carefully. This project topic "suitability of available laterite material in ilorin east local government area for road construction" have complete 5(five) Chapters. The complete Project Material/writeup include: Abstract + Introduction + etc + Literature Review + methodology + etc + Conclusion + Recommendation + References/Bibliography.Our aim of providing this "suitability of available laterite material in ilorin east local government area for road construction" project research material is to reduce the stress of moving from one school library to another all in the name of searching for "suitability of available laterite material in ilorin east local government area for road construction" research materials. We are not encouraging any form of plagiarism. This service is legal because, all institutions permit their students to read previous projects, books, articles or papers while developing their own works.
TITLE PAGE
SUITABILITY OF AVAILABLE LATERITE MATERIAL IN ILORIN EAST LOCAL GOVERNMENT AREA FOR ROAD CONSTRUCTION
BY
---
EE/H2013/01430
DEPARTMENT OF ----
SCHOOL OF ---
INSTITUTE OF ---
DECEMBER,2018
APPROVAL PAGE
This is to certify that the research work, "suitability of available laterite material in ilorin east local government area for road construction" by ---, Reg. No. EE/H2007/01430 submitted in partial fulfillment of the requirement award of a Higher National Diploma on --- has been approved.
By
--- . ---
Supervisor Head of Department.
Signature………………. Signature……………….
……………………………….
---
External Invigilator
DEDICATION
This project is dedicated to Almighty God for his protection, kindness, strength over my life throughout the period and also to my --- for his financial support and moral care towards me.Also to my mentor --- for her academic advice she often gives to me. May Almighty God shield them from the peril of this world and bless their entire endeavour Amen.
ACKNOWLEDGEMENT
The successful completion of this project work could not have been a reality without the encouragement of my --- and other people. My immensely appreciation goes to my humble and able supervisor mr. --- for his kindness in supervising this project.
My warmest gratitude goes to my parents for their moral, spiritual and financial support throughout my study in this institution.
My appreciation goes to some of my lecturers among whom are Mr. ---, and Dr. ---. I also recognize the support of some of the staff of --- among whom are: The General Manager, Deputy General manager, the internal Auditor Mr. --- and the ---. Finally, my appreciation goes to my elder sister ---, my lovely friends mercy ---, ---, --- and many others who were quite helpful.
PROJECT DESCRIPTION: This work "suitability of available laterite material in ilorin east local government area for road construction" research material is a complete and well researched project material strictly for academic purposes, which has been approved by different Lecturers from different higher institutions. We made Preliminary pages, Abstract and Chapter one of "suitability of available laterite material in ilorin east local government area for road construction" visible for everyone, then the complete material on "suitability of available laterite material in ilorin east local government area for road construction" is to be ordered for. Happy viewing!!!
Soil failure is a common sight in Nigeria road and structural constructions. The main purpose of this project is to investigate the suitability of the available laterite materials in Ilorin east local Government.
To determine the suitability of the soil in the three selected areas, Various tests were carried out on- the samples and those are classification test which is a test used in determining the type of soil. Also strength evaluation test was also done on the soil samples so as to determine the bearing capacity, density and strength of the soil and such strength evaluation tests, CBR test and moisture content test.
The project was undertaken following various laboratory soil test result to ascertain the type, strength and suitability of soil for any civil Engineering work.
After all these have been performed results are observation were made and final conclusion and recommendation were taken.
TABLE OF CONTENT
Title page i
Declaration ii
Certification iii
Dedication iv
Acknowledgement v
Abstract vi
Table of content vii
List of table viii
List of figure ix
CHAPTER ONE
INTRODUCTION 1
1.1 Lateritic Soil 1
1.1 Statement of the Problem 2
2.1 Aim and Objectives 2
1.1 Lateritic Soil 3
1.1 Statement of the Problem 3
2.1 Aim and objectives 3
1.3 Justification of Study 3
1.4 Scope of the Project 3
1.5 Methodology 3
CHAPTER TWO
2.0 Literature Review 5
2.1 Formation of Laterite Soil 6
2.2 Formation of Laterite Soil 7
2.3 Concept of Latrite For Pavement Design 8
2.4 Laterite for Subgrade, Base Course and Surfacing 9
2.5 Mineralogical and Physical Characteristics of Laterite Soil 10
2.6 Definition of Road 11
2.7 Types of Roads 11
CHAPTER THREE
3.0 Research Methodology 13
3.1 Collection of Samples 13
3.2 Laboratory Tests 14
3.3 Particle Size Distribution Test 14
3.4 Compaction Test 15
3.5 Atterberg Limit Test 17
3.6 California Bearing Ratio (CBR) Test 19
3.7 Natural Moisture Content 20
CHAPTER FOUR
4.0 Data Analysis, Result and Discussion 21
4.1 Sieve Analysis Test Result for Sample A 21
4.2 Compaction Test Result for the Determination of Bulk Density and Dry Density 29
4.7 Liquid and Plastic Limit Test Result for the Samples 36
4.5 Discussion of Sieve Analysis, Compaction Atterberg Limit California
Bearing Ratio Results 46
CHAPTER FIVE
5.0 Conclusion and Recommendation 48
5.1 Conclusion 48
5.2 Recommendation 49
Reference 50
LIST OF TABLES
Table 1: Sieve Analysis Result for Sample (Oke-Oyi) 21
Table 2: Sieve Analysis Result for Sample (Oke-Ose) 24
Table 3: Sieve Analysis Result for Sample (Iponrin) 26
Table 4: Compaction text result for Sample (Oke-Oyi) 29
Table 5: Result of Moisture and Dry Density (Oke-Ose) 30
Table 6: Result of Moisture Content and Dry Density (Oke-Oyi) 36
Table 7: Compaction Test Result for Sample (Iponrin) 37
Table 8: Compaction Test Result for Sample (Oke-Ose) 38
Table 9: Moisture Content Result for Sample (Iporin) 40
Table 10; Compaction Result for Sample (Oke-Oyi) 42
Table 11: Compaction Result for Sample (Oke-Ose) 43
Table 12: Compaction Result for Sample (Iporin) 45
Table 13: CBR Result for Sample (Oke-Oyi) 42
Table 14: CBR Result for Sample (Oke-Ose) 44
Table 15: CBR Result for Sample (Iporin) 46
LIST OF FIGURE
Figure 1: Sample A (Oke-Oyi) Sieve Analysis 23
Figure 2: Sample B (Oke-Ose) Sieve Analysis 25
Figure 3: Sample C (Iponrin) Sieve Analysis 28
Figure 4: Sample A (Oke-Oyi) Compaction 31
Figure 5: Sample B (Oke-Ose) Compaction 33
Figure 6: Sample C (Iporin) Compaction 35
Figure 7: Sample A (Oke-Oyi) Liquid and Plastic
Limit Test Result Sample 37
Figure 8: Sample B (Oke-Ose) Liquid and Plastic Limit Test 39
Figure 9: Sample C (Iporin) Liquid and Plastic Limit Test 41
CHAPTER ONE
INTRODUCTION
Soil is the cheapest and the most widely used material in civil engineering projects as foundation material either in its natural or improved form. It is highly heterogenous and an isotropic in nature and existing with different engineering properties which can be influenced to some extent by the presence of copper salt under the influence of water (Kadiyah and Lal, 2006).
The properties of soil as engineering material depends on its surface electrical charges, chemical composition size and shape e.t.c. The chemical composition influences the exhibition of enormous changes in the engineering properties especially in soil with high content of clay materials (Singh and Singh, 2006).
The geotechnical characteristics of soil are of great importance. The degree of these properties within certain range has a useful meaning in determining the best and suitability of it, for engineering construction especially for road construction (Ola, 2005).
1.1 Lateritic Soil
Laterite is well known in Asian countries as a building material for more than 1000 years. It was excavated from the soil and cut in form of large blocks; temples at Angkor are famous, examples for this early use.
Laterite is one of the most valuable materials for building. It is diffused in immense masses, without any appearance of stratification and is placed over the granite that forms the basis of Malayala. It is full of cavities and pores, and contains a very large quantity of iron in the form of yellow and red ochres. In the mass while excluded from the air, it is so soft, that any iron instrument readily cuts it, and is dug up in square masses with a pick-axe, and immediately cut into the shape wanted with a trowel, or large knife. It very soon after becomes as hard as brick and resists the air and water much better than any brick (Werner Schellmann, 1991).
The engineering behaviour of laterite material from trial pits is influenced by some factors which includes origin degree of weathering, mineral composition, environmental condition e.t.c. (Umebulues, 2001).
The result of these properties helps a lot and will serve as a guide in prospective works. This will also provide engineers with quick method of checking which material is best fit on the alternative for road construction (Clarke, 2007).
1.0.1 The importance of laterite as building material has already been mentioned. More relevant as their local use for the construction of simple houses in their application as a road building material. The suitability of lateritic materials above all of lateritic gravel is tested by several methods of engineering geology.
1.1 Statement of the Problem
Misunderstanding soils and their properties can lead to construction errors. The suitability of a soil for a particular use should be determined based on it engineering characteristics and not on usual inspection or apparent similarity to other soil.
Some particles of laterite tend to crush easily under impart disintegrating into a soil may be self hardening when exposed to drying or if they are not self hardening, they may contain appreciable amounts of hardened lateritic rock or gravel.
1.2 Aim and Objectives
The aim and objectives of this project include:
- To determine how suitable and durable the available laterite material in Ilorin East Local Government is for road construction.
- To carryout some geotechnical tests required for the strength evaluation of laterite material in order to determine its constructional suitability in road construction.
- To determine the strength of laterite and its durability.
- To determine whether these laterite materials meet the American Standard Test Method (ASTM) specification for road construction.
- To draw conclusion and recommendation from the evaluation as a standard for prescription of trial pits selected in Ilorin East Local Government Area to Engineers and Construction Industries.
1.3 Justification of Study
Due to the fact that laterite is a paramount material in the construction of road, it has to be investigated to determine its suitability for the construction of our roads.
1.4 Scope of the Project
The knowledge of the use of laterite for road construction is increasingly going far and wide over the years.
For the purpose of this research, the study shall be limited to Ilorin East Local Government Area of Kwara State in which the following laboratory test will be carried out on each samples of soil, the laboratory test are particle size distribution test. Atterberg’s limit test, compaction test, Natural Moisture Content and Califonia Bearing Ratio (CBR) test.
1.5 Methodology
This project will deal with the field and laboratory test of laterite material for road construction. Three different trial pit in Ilorin East Local Government Area will be selected.
The sample will be collected from three trial pit locations and will be labeled thus:
SAMPLE A
SAMPLE B
SAMPLE C
The engineering tests required for strength evaluation will be carried out such tests include CBR, Atterberg limit test, particle size distribution test, compaction test and natural moisture content.
The analysis of the result follows and the conclusion and recommendation were made.
1.6 PROJECT ORGANISATION
This work is divided into five sections including this introduction. Section 2 is on the literature review and method of data collection are in Section 3. Results of findings are discussed in Section 4. The way forward is and conclusion in Section 5.
CHAPTER TWO: The chapter one of this work has been displayed above. The complete chapter two of "suitability of available laterite material in ilorin east local government area for road construction" is also available. Order full work to download. Chapter two of "suitability of available laterite material in ilorin east local government area for road construction" consists of the literature review. In this chapter all the related work on "suitability of available laterite material in ilorin east local government area for road construction" was reviewed.
CHAPTER THREE: The complete chapter three of "suitability of available laterite material in ilorin east local government area for road construction" is available. Order full work to download. Chapter three of "suitability of available laterite material in ilorin east local government area for road construction" consists of the methodology. In this chapter all the method used in carrying out this work was discussed.
CHAPTER FOUR: The complete chapter four of "suitability of available laterite material in ilorin east local government area for road construction" is available. Order full work to download. Chapter four of "suitability of available laterite material in ilorin east local government area for road construction" consists of all the test conducted during the work and the result gotten after the whole work
CHAPTER FIVE: The complete chapter five of design and construction of a "suitability of available laterite material in ilorin east local government area for road construction" is available. Order full work to download. Chapter five of "suitability of available laterite material in ilorin east local government area for road construction" consist of conclusion, recommendation and references.
To "DOWNLOAD" the complete material on this particular topic above click "HERE"
Do you want our Bank Accounts? please click HERE
To view other related topics click HERE
To "SUMMIT" new topic(s), develop a new topic OR you did not see your topic on our site but want to confirm the availiability of your topic click HERE
Do you want us to research your new topic? if yes, click "HERE"
Do you have any question concerning our post/services? click HERE for answers to your questions
For more information contact us through any of the following means:
Mobile No :+2348146561114 or +2347015391124 [Mr. Innocent]
Email address :engr4project@gmail.com
COUNTRIES THAT FOUND OUR SERVICES USEFUL
Australia, Botswana, Canada, Europe, Ghana, Ireland, India, Kenya, Liberia, Malaysia, Namibia, New Zealand, Nigeria, Pakistan, Philippines, Singapore, Sierra Leone, South Africa, Uganda, United States, United Kindom, Zambia, Zimbabwe, etc
Support: +234 8146561114 or +2347015391124
Watsapp No :+2348146561114
Email Address :engr4project@gmail.com
FOLLOW / VISIT US VIA: